Skip to main content
Supplemental Correction Sheet for Solar Photovoltaic Systems (ELEC)
PC/ELEC/Corr.Lst.08-2016
       
How do I pay for an off-hour inspection?

Off-hour inspections can only be paid through the LADBS website.

    Read FAQ
Can I rebuild my attached or detached garage? Does it count as part of my 110%?

Yes you can rebuild your attached or detached garage as part of a like-for-like+10% project. Each detached structure will be evaluated individually for conformance with like-for-like requirements.

    Read FAQ
Los Angeles City Research Reports are allowed to be based on an Evaluation Report from a Nationally Recognized Model Code Agency. Who are Nationally Recognized Model Code Agencies currently accepted by LADBS Building Research Section?
    Read FAQ
Guidelines For Approval As Fabricator
IB/P/BC 2023-042
Effective Date:
       
Yakov Design
    Read More  
SOLICITUD DE LICENCIA DEL OFICIO
IN/App.29 Trade License Application
       
Fire Pump Room Pre-Test Clearance and Report
IN/Form042-2016
       
DIRECTRICES PARA VERIFICACIÓN DE PLANOS Y REQUISITOS PARA EMISIÓN DE PERMISOS PARA SISTEMAS DE ENERGÍA SOLAR
IB/P/GI 2014-027 Guidelines for Plan Check and Permit Requirements for Solar Energy Devices
       
What are the hours that I can work on my project?

Per the Los Angeles Zoning Code construction hours are 7:00 AM to 9:00 PM on weekdays, and 8:00 AM to 5:00 PM on Saturdays.

    Read FAQ
LADBS Employee Phone List
       
Green Building Code Correction Sheet for Newly Constructed Residential Buildings
PC/GRN/Corr.Lst.Res-New-2023
Effective Date:
       
What do I do once I comply with the Order To Comply?

Call the Inspector immediately to schedule an inspection to avoid any non-compliance fees.

    Read FAQ
When is an Architects & Engineer Certificate of Compliance required?

Projects that utilizes higher stresses require the Architect or Engineer to submit the form.

    Read FAQ
Can I have a special Event if there is no Certificate of Occupancy for the building?

No. To have a special event, the building must have a Certificate of Occupancy.

    Read FAQ
Inspection of Elevator Wiring
IB/P/EC 2017-004
       
Epoxy Injection of Cracks
PC/STR/Mod39-2020
       
Functional Performance Testing
GRN 24-2020
Effective Date:
       
REISSUED ARCX EXEMPTION CRITERIA UPDATE NOTICE-FINAL-040623
       
Complete Package Drafting - ADU58
    Read More