How is walking distance calculated per LAMC Section 12.22.A 33(c)(12)(i)(a)?
Walking distance is measured by the shortest distance that can be traveled by walking on public streets and sidewalks from a transit stop to the closest point on the subject Lot, as determined by generally available mapping systems, such as Google Maps.
How can an approval be renewed?
Can any testing agency listed or certify any electrical equipment to be used or installed in the City of Los Angeles?
No, the City of Los Angeles Municipal Code Section 93.0402 requires that the testing agencies and the product standards used by these agencies to be approved by the Department.
How can I get a copy of my plans (blueprints)?
When do I need a HVAC/Mechanical permit?
See the Los Angeles Municipal Code (L.A.M.C.), Section 95.112.1 for when a Mechanical permit is required.
How do I download the approved stamped plans and permit?
After the permit fee is paid, an LADBS Plan Check Engineer will stamp your plans and you will be able to download the stamped plans from your dashboard.
How long do I have to wait for a Demolition Pre-Inspection (DPI)?
A DPI normally takes two weeks minimum to be prepared.