Skip to main content
When do I need an Electrical permit?

See the Los Angeles Municipal Code (L.A.M.C.), Section 93.0201 for when an Electrical permit is required.

    Read FAQ
How long do I have to wait for a Sign Pre-Inspection (SPI) to be completed?

It normally takes minimum of two weeks for a Sign Pre-Inspection (SPI) to be completed.

    Read FAQ
Separate Approval for Fire Life Safety Plans
PC/ELEC/Mod041-2017
       
Application for Report of Residential Property Records and Pending Special Assessment Liens (Form 9)
AD.9
       
HOMEIO
    Read More  
GREEN BUILDING CODE PLAN CHECK NOTES NON-RESIDENTIAL BUILDINGS
GRN 15-2016
       
Contractor
    Read More  
Basis of Design (BOD)
GRN 21-2014
Effective Date:
       
Untreated Gray Water Correction Sheet (for 2017 Codes)
PC/MECH/Corr.Lst.107-2017
       
Code Enforcement Dashboard
    Read More  
Extension of Time to Start Construction
PC/STR/Mod42-2020
       
LADWP - Addressing Requirements
       
2014 L.A. Amendment to CA Residential Code
Ord. No.182845
       
Accessory Dwelling Unit (ADU)
    Read More  
What is involved in the building permit process?
  1. Applicant submits plans to LADBS, if plan check is required
  2. LADBS reviews plans and issues corrections, and mandates separate City and County approvals as needed
  3. Applicant corrects plans
  4. LADBS verifies cor
    Read FAQ
Soft-Story Retrofit Program
    Read More  
Historic Broadway Commercial Reuse Bringing Back Broadway
IB/P/BC 2023-125
Effective Date:
       
Heights of Fences in Residential Zones
IB/P/ZC 2023-002
Effective Date:
       
EBEWE Ordinances
       
Application for S.F.D.