Catherine Nuezca Gaba
- Oversees the following Building and Safety operations:
- One‐ and Two‐Unit Residential Complaint and Referral
- Commercial Complaint and Referral
- Vacant Building Abatement
- Pro‐active Code Enforcement
- Billboard and Sign Enforcement
- Environmental Affa
How much do I pay for a Permit extension?
The inspector assigned to your project can explain the required fees for a permit extension.
Residential Property Report
What is the difference between a Modification and a Variance?
A modification is issued/processed by LADBS. A variance is handled by the Department of City Planning, when a project is not a by-right project.
What projections are allowed to the building’s footprint and height and still be considered as an Eligible Project?
Eaves: Project into the required side yard not more than 4 inches for each foot of width of such side yard, provided the width of the side yard is not reduced to less than 30 inches. Project into the required front and rear yards not more than 30 inches.
Where can I find my sewer connection?
Please contact the Public Works Department.
Does electrical equipment require approval by the City of Los Angeles Building and Safety Electrical Testing Laboratory (LADBS-ETL)?
How can I report an unpermitted grading/construction?
What type of permit is required?
A permit is required for Demolition, New Building, Addition, and Alteration.