Skip to main content
Location of Elevator Controllers
IB/P/EV 2011-002
Effective Date:
       
AQMD Rule 445 Wood Burning Devices
       
What is the maneuvering clearance at the door?

Door maneuvering clearances are determined based on Approach Direction -- from the front, hinge side, latch side, approach side, pull or push side -- whether the path is perpendicular or parallel to a doorway.

See Table 11B-404.2.4.1 for each case scenario.



    Read FAQ
What is the electrical testing lab address?

2319 Dorris Place
Los Angeles, CA 90031


    Read FAQ
Do I need a permit for low voltage wiring?

Yes, if the installation involves a (1) communication circuit or class 2 signaling circuit over 30 volts or under 30 volts but more than 100 va, (2) amplifier circuits not using class 2 or 3 wiring, or (3) any circuit operating over 15 volts that control, generate, transmit, transform, or utilize

    Read FAQ
What do I do when I receive a non-compliance warning letter?

The letter is sent out as a reminder that the recipient of the order is required to comply with the violations, and to call the Inspector for an inspection before the compliance date on the letter. 

    Read FAQ
REGULACIÓN DE ENERGÍA CERTIFICADO DE CUMPLIMIENTO
IN/Form.011 Energy Regulation Certificate of Compliance
       
Are these plans open-source?

The City of Los Angeles is making pre-approved standard plans available as an additional resource to help property owners rebuild more quickly following the January 2025 Wildfires.

 

    Read FAQ
Can I use a slope of less than 1% for rain water piping?

No, since the pipe sizing tables for rain rainwater are based on a minimum 1% slope.

    Read FAQ
ERW Design
    Read More  
What form do I use for refunds?
    Read FAQ
Application for Review of Technical Reports & Import-Export Routes
PC/GRAD/App21-2018
       
Non-Residential Mandatory Measures for Additions and Alterations
PC/GRN/Corr.Lst.01-2014
Effective Date:
       
Geologic and Geotechnical Considerations for Rebuilding in the Palisades Fire Area
IB/P/BC 2025-157
       
Parallel Design - Permitting Process
       
What is a Range File?

A Range File is a Code Enforcement Violation.

    Read FAQ
What is the process of obtaining an LADBS-MTL approval?

The process to obtain a Los Angeles City Mechanical Research Report consists of the following steps:

    Read FAQ
Benchmarking 2021
    Read More  
Can I pay at the end of the evaluation or testing process?

No, the application number will be assigned when the completed application and payment are received.

    Read FAQ
Does the Department have copies of the plan for my house or building?

LADBS Records Section has as-built plans (blueprints) for Single Family Dwellings, Duplexes, Apartments, and most Commercial buildings, permitted and built after 1977.

 

    Read FAQ