Skip to main content
Where can I get my original Building Permit if it's not available from the city?

The County Assessor’s Office can provide the original Building Permit number. Building and Safety may be able to look it up by the permit number.

    Read FAQ
How long does it take to obtain an express permit?

Obtaining a permit online at our website dbs.lacity.gov takes only minutes.

    Read FAQ
Rules and Regulations for LADBS Testing Laboratories
IB/P/EC 2017-005
Effective Date:
       
Rules and Regulations for Hillside Exploratory Work Rules
IB/P/BC 2023-068
Effective Date:
       
Approved Testing Agency Renewal
IN/MC/TA-2025
       
Commissioning Plan Compliance Form
GRN 23-2023
Effective Date:
       
Supplemental Correction Sheet for Methane Mitigation Systems - Electrical (for 2011 Codes)
PC/ELEC/Corr.Lst.56-2011
       
Inspection Prior to Plan Check
PC/ALL/Mod27-20014
       
Siphonic Roof Drainage System
PC/ALL/Mod036-2017
       
Supplemental Correction Sheets for Cable Elevators (for 2011 Codes)
PC/MECH/Corr.Lst.27-2011
       
Covenant and Agreement Regarding Private Sewer Easement (Separate Owners for Each Parcel) (for 2011 Codes)
PC/STR/Aff34B-2008
       
Do I need approval from the Coastal Zone Committee to get a permit to rebuild my house?

Please inquire with the Department of City Planning for requirements and approvals relating to the Coastal Zone.

    Read FAQ
LADBS Go
    Read More  
Water Heater Temperature Relief Valve
IN/Mod09-2017
       
Can I install a stormwater infiltration system in a lot within a potentially liquefiable hazard zone?

In general, infiltration is not allowed within a potentially liquefiable hazard zone. However, sites within a potentially liquefiable zone can be considered for infiltration if a soils report demonstrates that the site is not subject to liquefaction.

    Read FAQ
Report Violation
    Read More  
Do I need to pay school fees and affordable housing linkage fees if I am building back a like-for-like Eligible Project? What if I am building back a project that is bigger than like-for-like?

Linkage Fee will not apply for the replacement of the existing house resulting in the net increase of 1500 sqft or less of floor area from the prior home that existed on the property. School District fees will not apply if the replacement house is built with the same square footage.

    Read FAQ
Graywater Standard Plan for Simple Residential System
       
How long do I have to wait for a Grading Pre-Inspection to be completed?

A Grading Pre-Inspection normally takes two weeks, but it could be longer.

    Read FAQ
How do I submit an application for an express permit?

You can apply for an express permit at LACPS.

    Read FAQ