Skip to main content
Grading Plan Check and Permit Fees
PC/GRAD/GGI16-2009
Effective Date:
       
What do I need to apply for Grading Pre-Inspection (GPI) Report?

You will need at least a plot plan to show the area of the propose grading and foundation work along with the cross-sections for the grading/foundation work.

    Read FAQ
Methane Standard Plan 2 of 8
       
Duties of a Registered Deputy Pressure Vessel Inspector
IB/P/MC 2022-009
Effective Date:
       
Pre-scheduled Meter Set Program
       
Supplemental Plan Check Correction Sheet for Sound Transmission (2017 LABC)
PC/STR/Corr.Lst.105-2017
       
Office of Statewide Health and Planning Department Requirements (OSHPD 3) Supplemental Plan Check Correction Sheet (2017 LABC)
PC/STR/Corr.Lst.113-2017
       
ARCx Registrtn and Paymt Guide-101521
       
Document Submittal Requirements for a New Single-Family Dwelling
IB/P/GI 2023-009
Effective Date:
       
Domestic Water Pipe Sizing
IB/P/PC 2023-009
Effective Date:
       
File Haul Route Complaint
    Read More  
What is the "Hillside Grading Area"?

Lands identified to be located within a Hillside Area based on the latest BOE Basic Grid Map A-13372, per Section 91.7003 of the Building Code. This map is on file in the official City documents located in the Office of the City Clerk in the Council File No. 121222 Sup. #1.

    Read FAQ
Sound Insulation Requirements for Noise Sensitive Structures Near Los Angeles International Airport
IB/P/BC 2014-074
       
Policy for Stamped Plans by Engineer or Architect
IB/P/BC 2023-073
Effective Date:
       
Emergency Escape Quick Release Systems
IB/P/BC 2023-043
Effective Date:
       
Can I change my email address for my ePlanLA account?

 No, you may not change your email. The email provided at registration serves as your account name.

    Read FAQ
Can I use testing conducted by our testing facility (in-house test lab)?

For General Approval – City of Los Angeles only:

    Read FAQ
Swimming Pools Plan Check Correction Sheets (2023 LABC)
PC/STR/Corr.Lst.108-2023
       
How can I obtain Green Building approval?

Contact the designated plan checker on your project to make an appointment for verification of corrections. Contact information is provided on the correction sheet. Approval for Green Building requirements will be provided after verification of all corrections is completed.

    Read FAQ
Supplemental Correction List for Type I Kitchen Hoods
PC/MECH/Corr.Lst.114-2014