See the Los Angeles Municipal Code (L.A.M.C.), Section 91.106.2 for when a Building permit is required.
An AQMD clearance letter is required whenever there is a "Yes" answer to any of the questions on the AQMD "Air Quality Permit Checklist". The AQMD clearance letter will be required before a Certificate of Occupancy is issued. For more information, please call 1-800-CUT-SMOG.
For elevator buildings, all units on floors served by the elevator must be accessible. For non-elevator buildings, all ground floor units must be accessible.
1 in 6 DA parking stalls required by Table 11B-208.3 must be a van stall.
No. Each pre-approved plan is available for a fee determined by the architect or designer in consultation with the homeowner/client. Please see the link, ‘For further information on this standard plan click here.’ listed under each plan.