Code Enforcement Bureau Fees Explained (Spanish Version)
       
Can I request a different inspector?

Inspectors are assigned by district, with a few exceptions.

    Read FAQ
How much will it cost to expedite?

Plan check expedite fee is 150% of the original plan check fee. See 93.0233(h) and 98.0422 for more details.

    Read FAQ
Document Submittal Requirements for a New SFD or ADU Standard Plan
       
Al Fresco Fast Track Permit Form
       
Inspection Construction Map Bel Air - Beverly Crest Map
       
Application for Building Permit or Grading and Certificate of Occupancy
PC/STR/App01-2023
       
Where can I obtain a copy of the Green Building Code?

CALGreen and Los Angeles Green Building Codes are available to view on our website.

    Read FAQ
AB 3002 Notice in Spanish
       
How do I know if LA City has a Standard Plan for my project?

You can visit our Pre-Approved Standard Plans page for more information. 

    Read FAQ
Supplemental Plan Check Correction Sheet for Concrete Special Moment Resist Frame (2023 LABC)
PC/STR/Corr.Lst.035-2023
       
Sample plan for Mixed use
       
What is an inspection?

All construction work for which a permit is required shall be subject to inspection by authorized inspectors. An inspection must be performed before work is concealed or covered. It is your responsibility to notify the inspector when the work is ready for inspection.

    Read FAQ
For the purposes of assessing a per-unit impact fee to an ADU that is 750 square feet or larger on a Lot with a multifamily dwelling structure, how is the square footage of the primary residence determined?

The fee must be proportional to the average size of all dwelling units on the Lot. Floor plans showing the sizes of all units may be required to make this determination. An applicant may  choose to pay the full fee in lieu of providing these plans.

    Read FAQ
MANDATORY REQUIREMENTS CHECKLIST ADDITIONS AND ALTERATIONS TO NON-RESIDENTIAL BUILDINGS
GRN 10-2015
       
Can I submit more than one plan file?

No, all plan sheets must be combined into one PDF document.

    Read FAQ
Green Building Code Plan Check Notes Non-Residential Buildings
GRN 15-2020
Effective Date:
       
MANDATORY REQUIREMENTS CHECKLIST ADDITIONS AND ALTERATIONS TO RESIDENTIAL BUILDINGS
GRN 9-2020
Effective Date:
       
April 2024 Newsletter
       
Permitted Construction and Demolition Hours
    Read More