Skip to main content
STORM WATER POLLUTION CONTROL
GRN 1-2014
       
Maintenance Affidavit for Sump Pump with Natural Gas Back-up Generator
PC/GRAD/Aff09-2015
       
I have submitted my plans for Plan Check. When will my plans be assigned to a plan check staff?

There is no set time and it changes based on our workload. You can ask staff who are processing your plan submittal to give you an idea on the number of the working days it will take to assign your plans. This waiting time is called backlog.

    Read FAQ
Existing Buildings Energy & Water Efficiency Program
    Read More  
ALL-ELECTRIC BUILDINGS ORDINANCE
       
Mandatory Wood Frame Soft-Story Retrofit Plan Review List-Chapter 93 (2017 LABC)
PC/STR/Corr.Lst.114-2017
       
Benchmarking User Instruction Guides TOC-FINAL
       
California Lead Free Law Requirements
       
Newly Constructed Non-Residential Buildings Green Building Correction Sheet
PC/GRN/Corr.Lst.02-2017
Effective Date:
       
Safety Test - Cabled Elevators Installed Prior to October 25, 1998 One and Five Year (Group II)
IN/EPV/Form01-2016
       
Is a permit required to install a domestic cooking range, broiler unit, or domestic-type clothes dryer in my single-family dwelling unit?

No.

    Read FAQ
Acknowledgement of Deferred Collection of Plan Check and Permit Fees per the Mayor's Emergency Executive Order No. 7
       
Plastic Underground Piping Variance
PC/ALL/Mod101-2017
       
Can I use these plans to add an ADU as an addition to my home?

No, these pre-approved ADU Standard Plans are only for new, detached structures.

    Read FAQ
Supplemental Correction Sheet for the Baseline Hillside Ordinance (BHO) (Ordinance No. 184,802 Effective 01/01/2023)
PC/STR/Corr.Lst.107A
       
When is an Energy Certificate required?

When work performed and materials used are required to comply with Title 24 Energy Regulations.

    Read FAQ
Garage Drains
IB/P/PC 2023-011
Effective Date:
       
Supplemental Plan Check List for Prestress Concrete (2023 LABC)
PC/STR/Corr.Lst.043-2023
       
What are the steps of the ePlanLA application process?

The steps of an ePlanLA application are:

1. Submit Application for Screening 
2. Application Review 
3. Plan Check 
4. Corrections Issued 
5. Plan Check Complete 
6. Permit Issued
 

    Read FAQ
Accessibility Details for Restrooms and Drinking Fountains
IB/P/BC 2020-087
Effective Date: