Regular Plan Check
Permits for large complex projects are issued through a Regular Plan Check process.
Additional Information
The plans are reviewed and then returned within weeks depending on workload. With 50% more of the plan check fee paid, the plan check review will be expedited.
Regular Plan Checks are processed at our Metro, Van Nuys, and W.L.A. locations, although plans may be submitted to any Development Services Center.
Additional Resources
- Information Bulletins
Filtered categories:
Supplemental Plan Check Correction Sheet for Masonry Wall Design (2017 LABC)
PC/STR/Corr.Lst.042-2017
Supplemental Plan Check Correction Sheet for Masonry Wall Design (2020 LABC)
PC/STR/Corr.Lst.042-2020
Supplemental Plan Check Correction Sheet for Methane Seepage Regulations (2020 LABC)
PC/STR/Corr.Lst.055-2020
Supplemental Plan Check Correction Sheet for Methane Seepage Regulations (2020 LABC)
PC/STR/Corr.Lst.055-2020
Supplemental Plan Check Correction Sheet for Office of Statewide Health and Planning Department (OSHPD) Requirements (2020 LABC)
PC/STR/Corr.Lst.113-2020
Supplemental Plan Check Correction Sheet for Security Requirements (2020 LABC)
PC/STR/Corr.Lst.103-2020
Supplemental Plan Check Correction Sheet for Sound Transmission (2017 LABC)
PC/STR/Corr.Lst.105-2017
Supplemental Plan Check Correction Sheet for Sound Transmission (2017 LABC)
PC/STR/Corr.Lst.105-2017
Supplemental Plan Check Correction Sheet for Sound Transmission (2020 LABC)
PC/STR/Corr.Lst.105-2020
Supplemental Plan Check Correction Sheet for Steel Moment Frame Design (2020 LABC)
PC/STR/Corr.Lst.052-2020