Regular Plan Check
Permits for large complex projects are issued through a Regular Plan Check process.
Additional Information
The plans are reviewed and then returned within weeks depending on workload. With 50% more of the plan check fee paid, the plan check review will be expedited.
Regular Plan Checks are processed at our Metro, Van Nuys, and W.L.A. locations, although plans may be submitted to any Development Services Center. Plans are assigned within a few days of submittal.
Additional Resources
- Information Bulletins
Filtered categories:
Supplemental Plan Check Correction Sheet For Concrete Special Moment Resisting Frame (2017 LABC)
PC/STR/Corr.Lst.035-2017
Supplemental Plan Check Correction Sheet For Concrete Special Moment Resisting Frame (2020 LABC)
PC/STR/Corr.Lst.035-2020
Supplemental Plan Check Correction Sheet for Concrete Special Moment Resist Frame (2023 LABC)
PC/STR/Corr.Lst.035-2023
Supplementl Concrete Tilt Up Retrofit Plan Check Correction Sheet (2017 LABC)
PC/STR/Corr.Lst.036-2017
Supplemental Plan Check Correction Sheet For Concrete Tilt Up Retrofit (Historical Document)
PC/STR/Corr.Lst.036-2020
Supplemental Concrete Tilt Up Retrofit Plan Check Correction Sheet (2023 LABC)
PC/STR/Corr.Lst.036-2023
Supplemental Plan Check Correction Sheet For Curtain Wall Design (2017 LABC)
PC/STR/Corr.Lst.037-2017
Supplemental Plan Check Correction Sheet For Curtain Wall Design (2020 LABC)
PC/STR/Corr.Lst.037-2020
Supplemental Correction Sheet Curtain Wall (2023 LABC)
PC/STR/Corr.Lst.037-2023
Supplemental Structural Correction Sheet for Flexible Diaphragm with Rigid Wall (2014 LABC)
PC/STR/Corr.Lst.038-2014