Regular Plan Check
Permits for large complex projects are issued through a Regular Plan Check process.
Additional Information
The plans are reviewed and then returned within weeks depending on workload. With 50% more of the plan check fee paid, the plan check review will be expedited.
Regular Plan Checks are processed at our Metro, Van Nuys, and W.L.A. locations, although plans may be submitted to any Development Services Center. Plans are assigned within a few days of submittal.
Additional Resources
- Information Bulletins
Filtered categories:
Supplemental Structural Correction Sheet Steel Brace Frame Design (2023 LABC)
PC/STR/Corr.Lst.044-2023
Supplemental Plan Check Correction Sheet for Two-way Concrete Slab (2017 LABC)
PC/STR/Corr.Lst.045-2017
Supplemental Plan Check Correction Sheet for Two-way Concrete Slab (2020 LABC)
PC/STR/Corr.Lst.045-2020
Supplemental Plan Check Correction Sheet for Two-way Concrete Slab (2023 LABC)
PC/STR/Corr.Lst.045-2023
Supplemental Structural Correction Sheet Steel Moment Frame Design (2017 LABC)
PC/STR/Corr.Lst.052-2017
Supplemental Structural Correction Sheet Steel Moment Frame Design (2023 LABC)
PC/STR/Corr.Lst.052-2017
Supplemental Plan Check Correction Sheet for Steel Moment Frame Design (2020 LABC)
PC/STR/Corr.Lst.052-2020
Supplemental Plan Check Correction Sheet for Unreinforced Masonry (URM) Retrofit (2017 LABC)
PC/STR/Corr.Lst.053-2017
Supplemental Plan Check Correction Sheet for Unreinforced Masonry (URM) Retrofit (2023 LABC)
PC/STR/Corr.Lst.053-2023
Supplemental Plan Check Correction Sheet for Flood Hazard Specific Plan (2023 LABC)
PC/STR/Corr.Lst.054-2023