Regular Plan Check
Permits for large complex projects are issued through a Regular Plan Check process.
Additional Information
The plans are reviewed and then returned within weeks depending on workload. With 50% more of the plan check fee paid, the plan check review will be expedited.
Regular Plan Checks are processed at our Metro, Van Nuys, and W.L.A. locations, although plans may be submitted to any Development Services Center.
Additional Resources
- Information Bulletins
Filtered categories:
Supplemental Correction Sheets for Sewage Ejectors & Sump Pumps (for 2017 Codes)
PC/MECH/Corr.Lst.31-2017
Supplemental Plan Check Correction Sheet for 2020 Building Energy Standards (2019 California Code of Regulations Title 24, Part 6)
PC/STR/Corr.Lst.102-2020
Supplemental Plan Check Correction Sheet for Bicycle parking Ordinance (Ordinance 182,386 & 185,430)
PC/STR/Corr.Lst.111-2020
Supplemental Plan Check Correction Sheet For Concrete Special Moment Resisting Frame (2017 LABC)
PC/STR/Corr.Lst.035-2017
Supplemental Plan Check Correction Sheet For Concrete Special Moment Resisting Frame (2020 LABC)
PC/STR/Corr.Lst.035-2020
Supplemental Plan Check Correction Sheet For Concrete Tilt Up Retrofit (Historical Document)
PC/STR/Corr.Lst.036-2020
Supplemental Plan Check Correction Sheet For Curtain Wall Design (2017 LABC)
PC/STR/Corr.Lst.037-2017
Supplemental Plan Check Correction Sheet For Curtain Wall Design (2020 LABC)
PC/STR/Corr.Lst.037-2020
Supplemental Plan Check Correction Sheet for Hillside Construction on Slopes Greater than 33 Percent (2023 LABC)
PC/STR/Corr.Lst.039-2023
Supplemental Plan Check Correction Sheet For LA Residential Code Wood Prescriptive Design (2020 Los Angeles Residential Code)
PC/STR/Corr.Lst.020B-2020