Skip to main content
Benchmarking 2018
    Read More  
Vacant Building Abatement
       
Electrical Test Lab (ETL)
    Read More  
Application Package for Accreditation of Electrical Testing Laboratory
Req/Form10-2017
       
Can I use ABS pipe in a residential building?

Plastic waste and vent piping in residential occupancies are allowed when the residential portion of the building is 2 stories or less.

    Read FAQ
Commissioning Report (for 2011 Codes)
GRN 26-2011
       
NFPA 14 2019 - Plan Check Correction Sheet
PC/MECH/NFPA14-2019
       
How many dwelling units can I add or build before DA requirements kick in?

Addition of 3 or more newly-constructed units will trigger DA requirements.

    Read FAQ
Maintenance of Building (Vehicle Life System - 2 Levels) (for 2011 Codes)
PC/STR/Aff43-2012
       
Methane Hazard Mitigation Standard Plan Simplified Method for Small Additions
IB/P/BC 2023-102
Effective Date:
       
Good Neighbor Construction Practices
       
Structural Observation
IB/P/BC 2023-024
Effective Date:
       
Document Submittal Requirements for a New Accessory Dwelling Unit (ADU) Standard Plan
IB/P/GI 2023-032
Effective Date:
       
Where can I get a copy of the electrical code?

A copy of the electrical code can be obtained from NFPA.org.

    Read FAQ
My neighbor is excavation close to my property line. What can I do to protect my property?

The City requires the applicant for a project with excavation close to a property line to notify the affected property via a certified mail.

    Read FAQ
EBEWE ARCx FAQs
       
Storm Water Containment Systems
IB/P/BC 2023-130
Effective Date:
       
Virtual Inspection Program Participation Agreement Waiver and Release of Liability
       
Code Enforcement Bureau Fees Explained (English Version)
       
Will other agencies need to review my plans? Do other clearances still apply?

While the Pre-Approved Standard Plan Program streamlines the building and safety review process, other agency/departmental reviews and clearances may still be required depending on your specific site conditions and type of rebuild.

    Read FAQ