Skip to main content
When is a deputy report required?

When there are higher stresses in the structural design.

    Read FAQ
Plumbing Fixture Flow Rate Tables (Non-Residential) (for 2011 Codes)
GRN 17-2013
       
EBEWE Base Bldgs Exemption Lease Chklist FINAL
       
Expanded Counter Plan Check
    Read More  
How do I find a Contractor?

Please visit the Contractors State License Board for information regarding hiring a contractor and to verify if a contractor is licensed and insured: http://cslb.ca.gov.

    Read FAQ
When do I need to post a grading bond?

A grading bond is required for projects with over 250 CY of cut or fill in a Hillside Grading Area.

    Read FAQ
What is this program about?

The purpose of this program is to reduce the risk of injury or loss of life that may result from the effects of earthquakes on wood frame soft-story buildings. In the Northridge Earthquake, many wood frame soft- story buildings caused loss of life, injury, and property damage.

    Read FAQ
When is a T-bar ceiling inspection required?

When all HVAC, electrical, and fire sprinkler are installed in the ceiling, but before covering.

    Read FAQ
Demand Factor of 0.65 to a Group of Reefer Receptacles
PC/ELEC/Mod08-2017
       
Methane Exemption for Single Family Dwellings with Raised Foundations
PC/STR/Mod57C-2020
       
Do I need a plan check?

You will need a plan check when the scope of work involves items under code section 93.0206.

    Read FAQ
What is plan check?

Plan check is a process of which the plans are reviewed for compliance to current codes. For this program, the plans will be reviewed for compliance to the mandatory retrofit ordinance 183983 and 184081. Once plans have been reviewed and approved, permit can be issued.

    Read FAQ
Can I expedite the review process?

Yes. Pursuant to section 98.0422 of the Los Angeles City Municipal Code, expedite review process is available for the amount of the fee equal to one-half of the review fee, in addition to the normal review fee.

    Read FAQ
Whom do I appeal a Building Code violation to?

You can appeal is to LADBS and your appeal will be heard by LADBS Board of Commissioners. You will need to submit your appeal by completing this form.

    Read FAQ
Implementation Guidelines
    Read More  
Early Start Permits
IB/P/BC 2023-097
Effective Date:
       
What is the height of the building?

A point measured from the lowest adjacent grade to a point at the top of the building.

    Read FAQ
Does my Commercial Coach need to be approved by State?

Yes. See the Information Bulletin P/BC 2023-079 for more details.

    Read FAQ
Pre-Approved Standard Plans
    Read More  
Registered Deputy Inspector Performance Report
IN/Form102