Skip to main content
Non-potable Rainwater Catchment System Correction Sheet
PC/MECH/Corr.Lst.109-2017
       
I am installing a new elevator in an existing building. Does it need to comply with the requirements for medical emergency elevators?

If the building was built prior to 1/26/1988, the elevator does not have to comply with the requirements for medical emergency elevators.

    Read FAQ
How do I know if the equipment is still approved?

Make sure that the equipment approval has not expired by checking the equipment approval letter. Each letter has an approval and expiration date that is indicated on the top right hand of the letter.

    Read FAQ
How are the fees calculated for a TCO?

The fees are calculated by the type of occupancy.

    Read FAQ
Signs-General Plan Check Correction Sheets (2023 LABC)
PC/STR/Corr.Lst.059-2023
       
Supplemental Plan Check Correction Sheet for Two-way Concrete Slab (2023 LABC)
PC/STR/Corr.Lst.045-2023
       
Supplemental Plan Check Correction Sheet for Sound Transmission (2017 LABC)
PC/STR/Corr.Lst.105-2017
       
Supplemental Plan Review Checklist No. 1 - Elevators, Lulas and Platform Lifts
PC/DAD/Corr.Lst.01-2017
       
Application for Duplex
       
Do temporary structures need to comply with DA requirements?

Disabled access requirements apply to both temporary and permanent structures.

    Read FAQ
LAFD ESS Memo and Checklist
       
Structural Engineering Associate Bulletin
       
Temporary Special Events
    Read More  
Application for Plumbing Permit or Plan Check
PC/MECH/App5-2019
       
Grading Permit Surety Bond
GGI6-2016
Effective Date:
       
Benchmark What's New
       
Why can't I infiltrate stormwater on my property?

Sites in most hillside areas, within potentially liquefiable zones, where infiltration rates are too low, or where the earth materials exhibit adverse conditions when saturated (e.g., expansive or hydro collapsible soils) are generally not allowed to infiltrate stormwater.

    Read FAQ
Gas Meter Assistance
    Read More  
What items are required for plan check submission using an SFD Pre-Approved Standard Plan?

For a complete listing of building permit submittal requirements, please refer to the Building Permit Checklist.

    Read FAQ
Emergency Escape Quick Release Systems
IB/P/BC 2017-043