Skip to main content
How much does it cost to have a report reviewed by the Grading Division?

Please refer to Department fee schedule online for general fees. Final fees to be determined at the time of submittal.

    Read FAQ
When do I need to get Title 24, Part 6 energy plan checked?

You need to get a Title 24, Part 6 State energy regulation compliance plan check whenever you alter, repair, add, modify or install new lighting, or install new service or distribution systems as described in the California Energy Code.

    Read FAQ
Are you requesting data?

Explore extensive information and valuable insights! Uncover data from various city departments, including LADBS programs.

    Read FAQ
Regulations Regarding Registration for Deputy Inspection (with Application)
IB/P/BC 2020-035
       
Commissioning Report
GRN 26-2020
Effective Date:
       
Tract Sales Office Affidavit (for 2011 Codes)
PC/STR/Aff36-2008
       
Site Testing Standards for Methane
IB/P/BC 2020-101
Effective Date:
       
When is a building verification required?

Building verification is required after all other division clearances have been obtained.

    Read FAQ
Procedures for Hazardous or Contaminated Materials Found during Geological Exploration
IB/P/BC 2020-131
Effective Date:
       
LAFD Requirement 96 Solar Photovoltaic System
       
Owner Statement and Acknowledgment of Compliance (Re-Roof, Smoke-C/O detector, etc)
IN/Form13-2016
       
List of Approved Testing Agencies (Mechanical)
       
Covenant and Agreement Regarding Junior Accessory Dwelling Unit
PC/STR/Aff45-2020
       
Landscape Certification
GRN 12-2023
Effective Date:
       
Victor Cuevas
  • Licensed Civil Engineer
  • Oversees the following Building and Safety operations:
    • Residential Inspection
      • Residential Demolition Pre-Inspection Permits (DPI)
      • Residential Construction Inspections
      • Compliance with All Ordinances and City
    Read FAQ
ARCx Completion of Energy-100422
       
What items are required for plan check submission using an ADU Pre-Approved Standard Plan.
  • To obtain a building permit, you will need to provide a completed Building Permit Application, a copy of the LA City approved stamped ADU Standard Plan, and plans indicating how the Standard Plan will be adapted to a specific site.
    Read FAQ
Testing Req for Smoke Control Systems
IB/P/MC 2023-001
Effective Date:
       
Can I install a master PRV downstream of the fire pump in a sprinkler system?

A master PRV is allowed to be installed downstream of a fire pump when a second master PRV is installed to provide redundancy, so that failure of one PRV does not affect the operation of the fire protection system.

    Read FAQ
What are the requirements for a HVAC application?

 

    Read FAQ