What do I do if I receive an Order To Comply in error?
There could be many reasons why you received an Order To Comply. Do not dismiss it as an error.
Contact the issuing Inspector so the necessary corrections can be completed, if needed. This helps avoid future fees and enforcement.
What product standard(s) do I need to have my product tested by an approved testing agency?
A product (or equipment) is considered approved if it bears either the approval label of the City of Los Angeles Electrical Test Lab, or listing or certification label, symbol or other identifying mark of a recognized testing agency.
How many permits do I need for my house addition?
You can obtain one combined permit for the addition which covers the electrical, plumbing, HVAC, etc. work. However, a separate Sprinkler permit is required if the house needs to be sprinklered throughout due to the addition and remodeling.
Does my rebuild project need to comply with the current Energy Code?
Yes, the current Energy Code applies.
Is an elevator or lift required for a multi-story building?
An accessible route must be provided to connect each story and mezzanine in a multi-story building (see exceptions per 11B-206.2.3).
Do I need plan check to install window AC units?
No, plan check is not required for ductless window units.
When do I need an Elevator permit?
See the Los Angeles Municipal Code (L.A.M.C.), Section 92.0129(b) for when an Elevator permit is required.