Regular Plan Check
Permits for large complex projects are issued through a Regular Plan Check process.
Additional Information
The plans are reviewed and then returned within weeks depending on workload. With 50% more of the plan check fee paid, the plan check review will be expedited.
Regular Plan Checks are processed at our Metro, Van Nuys, and W.L.A. locations, although plans may be submitted to any Development Services Center. Plans are assigned within a few days of submittal.
Additional Resources
- Information Bulletins
Filtered categories:
Torque Testing & Installation Inspection of Drilled - In Anchors
IB/P/BC 2023-092
- Effective
6 Inch Concrete Block Masonry Wall Detail
IB/P/BC 2023-096
- Effective
Structural Design Guidelines for Steel Moment-Resisting Frames
IB/P/BC 2023-098
- Effective
Acceptable Design and Analysis Methods for Use of Slabs-On-Grade As Foundations
IB/P/BC 2023-100
- Effective
Methane Hazard Mitigation Standard Plan Simplified Method for Small Additions
IB/P/BC 2023-102
- Effective
Use of Sump Pumps for Surface and Subsurface Drainage
IB/P/BC 2023-103
- Effective