Regular Plan Check
Permits for large complex projects are issued through a Regular Plan Check process.
Additional Information
The plans are reviewed and then returned within weeks depending on workload. With 50% more of the plan check fee paid, the plan check review will be expedited.
Regular Plan Checks are processed at our Metro, Van Nuys, and W.L.A. locations, although plans may be submitted to any Development Services Center. Plans are assigned within a few days of submittal.
Additional Resources
- Information Bulletins
Filtered categories:
Structural Monitoring Equipment in Buildings Designed with Nonlinear Response History Procedure
IB/P/BC 2026-117
- Effective
Interim General Policy for Plan Check Time Extension
IB/P/BC 2026-120
- Effective
Alternative Design Procedure for Seismic Analysis and Design of Tall Buildings and Buildings Utilizing Complex Structural Systems
IB/P/BC 2026-123
- Effective
Guidelines for Permits and Inspections for Construction Projects that Require Grading Work
IB/P/BC 2026-128
- Effective
Surface Fault Rupture Hazard Investigations
IB/P/BC 2026-129
- Effective
Procedures for Hazardous or Contaminated Materials Found during Geological Exploration
IB/P/BC 2026-131
- Effective
Soils/Geology Report Reqs when Filing Parcel Map with City Planning
IB/P/BC 2026-132
- Effective