Disabled Access and Accessibility
Plans submitted for new construction or alteration to an apartment and/or commercial building for a building permit will also be separately reviewed for disabled access and accessibility.
Additional Resources
- Documents & Applications
- Information Bulletins
- Requests for Modifications
- Standard Correction Lists
- Standard Plans
Filtered categories:
Swimming Pools Plan Check Correction Sheet (2017 LABC)
PC/STR/Corr.Lst.108-2017
Supplemental Plan Check Correction Sheet for Sound Transmission (2017 LABC)
PC/STR/Corr.Lst.105-2017
Supplemental Plan Check Corrections Sheet for Security Requirements (2017 LABC)
PC/STR/Corr.Lst.103-2017
Counter Plan Check Correction Sheet (2017 LABC)
PC/STR/Corr.Lst.058-2017
Supplemental Correction Sheet for Solar Photovoltaic Systems (ELEC)
PC/ELEC/Corr.Lst.08-2016
Supplemental Correction Sheet for Electrical Fire Pump System
PC/ELEC/Corr.Lst.24-2017
City of Los Angeles Electrical Plan Check Correction List
PC/ELEC/Corr.Lst.08-2017
Filtered categories:
What do I need to pull a permit as an authorized agent for a contractor?
What do I need to pull a permit as an authorized agent for an Owner-Builder?
What equipment that is listed by a recognized testing agency is acceptable?
What general development standards from LAMC Section 12.22 A.33(c) apply to Movable Tiny Houses (MTHs)?
Filtered categories:
Erection and Maintenance of Building in Areas Subject to Inundation or Physical Hazards Geological Nature
PC/STR/Aff21-2014
Erection and Maintenance of Building in Areas Subject to Inundation or Physical Hazards Geological Nature (for 2011 Codes)
PC/STR/Aff21-2009
Filtered categories:
What do I need to pull a permit as an authorized agent for a contractor?
What do I need to pull a permit as an authorized agent for an Owner-Builder?
What equipment that is listed by a recognized testing agency is acceptable?
What general development standards from LAMC Section 12.22 A.33(c) apply to Movable Tiny Houses (MTHs)?