Building Permits
Building Permits are required for new constructions, additions, alterations, and demolition/removal of a building or structure.
About Building Permits
Building plans shall be filed and approved by the Department (as a Building Plan Check) before any permit is issued for the following:
- New building or structure
- Addition to building
- Structural alteration to building or structure
- Interior modification and change of floor plan
- Change of use and/or occupancy
- Parking layout change
- Use-of-land, such as recycling deposit center, open air storage, outdoor temporary events
- Signs and sign structures
- Fences, retaining walls and shoring plans
For more information on the Plan Check process, visit our Express Permit, Regular Plan Check and Counter Plan Check pages.
Additional Resources
Find Building Permit-related PDFs and forms here. For more options, visit our Forms and Publications page.
- Code Amendment
- Forms & Applications
- Information Bulletins
- Requests for Modifications
- Standard Correction Lists
Filtered categories:
Standard for Existing Building Glass Retrofitted with an Approved Organic Film
IB/P/BC 2023-052
- Effective
Alternate Design Methodology for Unreinforced Masonry Buildings
IB/P/BC 2011-053
- Effective
Alternate Design Methodology for Unreinforced Masonry Buildings
IB/P/BC 2020-053
- Effective
Crack Repair of Unreinforced Masonry Walls with Grout Injection
IB/P/BC 2023-056
- Effective
Swimming Pool Permit Issuance and Inspection Procedure for Noise Level Control
IB/P/BC 2014-059
- Effective
Filtered categories:
When do I need a soils, a geology, or a combined soils and geology report?
Filtered categories:
How to Obtain Copies of City of Los Angeles Ordinances
IB/P/GI 2023-025
- Effective
HVAC CALEFACCIÓN Y ENFRIAMIENTO PARA COMFORT O MANTENIMIENTO DE REFRIGERACIÓN CERTIFICADO DE REGISTRO
IN/TL.009 HVAC Cert. of Registry
Hydraulic Test - Elevators Installed After October 25, 1998 One and Five Year (Group III and IV)
IN/EPV/Form05-2016
Hydraulic Test - Elevators Installed Prior to October 25, 1998 Five Year (Group II)
IN/EPV/Form04-2016
IB-PBC-2023-119 Alternate Building Materials and Products approval_Draft_20240212
- Effective
Filtered categories:
When do I need a soils, a geology, or a combined soils and geology report?