Building Permits
Building Permits are required for new constructions, additions, alterations, and demolition/removal of a building or structure.
About Building Permits
Building plans shall be filed and approved by the Department (as a Building Plan Check) before any permit is issued for the following:
- New building or structure
- Addition to building
- Structural alteration to building or structure
- Interior modification and change of floor plan
- Change of use and/or occupancy
- Parking layout change
- Use-of-land, such as recycling deposit center, open air storage, outdoor temporary events
- Signs and sign structures
- Fences, retaining walls and shoring plans
For more information on the Plan Check process, visit our Express Permit, Regular Plan Check and Counter Plan Check pages.
Additional Resources
Find Building Permit-related PDFs and forms here. For more options, visit our Forms and Publications page.
- Code Amendment
- Forms & Applications
- Information Bulletins
- Requests for Modifications
- Standard Correction Lists
Filtered categories:
Use a Scale per Foot Smaller than 0.125 Inch for Site Utility Drawing
PC/ELEC/Mod16-2017
Installation of Equipment Prior to Test Lab Approval
PC/ELEC/Mod13-2017
Demand Factor of 0.65 to a Group of Reefer Receptacles
PC/ELEC/Mod08-2017
Filtered categories:
I am installing a new air conditioning system, what type of filters do I need to use?
I am installing a new elevator in an existing building. Does it need to comply with the requirements for medical emergency elevators?
I am using listed components in my panel. Why do I need approval for the panel?
If a garage is converted into a Junior Accessory Dwelling Unit (JADU), do you need to provide replacement parking?
If a portion of a single family dwelling is converted into a JADU, do I need a separate address for the JADU?
If I make a mistake when entering my inspection type or contact information, can I correct it?
Filtered categories:
Covenant and Agreement to Hold Property as One Parcel (Lot Tie Affidavit) (for 2011 Codes)
PC/STR/Aff22-2009
Covenant and Agreement to Provide Parking Attendant (for 2011 Codes)
PC/STR/Aff31-2008
Covid-19 - Emergency Tolling of Deadlines Related to Expiration of Permits and Related Documents
IB/P/GI 2023-033
- Effective
Crack Repair of Unreinforced Masonry Walls with Grout Injection
IB/P/BC 2023-056
- Effective
Cutting, Notching, and Boring of Wood Framing Members
IB/P/BC 2023-007
- Effective
Data Collection, Material Testing and Condition Assessment Requirements for Existing Concrete Buildings
IB/P/BC 2023-153
- Effective
DE ELEVADOR DEL SILLA DE RUEDAS
In/EPV/Form.008 Wheelchair Lift Mechanics
Definition of "Commenced Construction" and Similar Phrases
IB/P/GI 2020-016
Filtered categories:
I am installing a new air conditioning system, what type of filters do I need to use?
I am installing a new elevator in an existing building. Does it need to comply with the requirements for medical emergency elevators?
I am using listed components in my panel. Why do I need approval for the panel?
If a garage is converted into a Junior Accessory Dwelling Unit (JADU), do you need to provide replacement parking?
If a portion of a single family dwelling is converted into a JADU, do I need a separate address for the JADU?
If I make a mistake when entering my inspection type or contact information, can I correct it?