Electrical Test Lab (ETL)
The ETL evaluates electrical equipment for safety, fire and shock hazards and personnel injuries in accordance with the current applicable codes and standards. Approved materials are published as Los Angeles Research Reports (LARR).
Contact the
ETL
Electrical Testing Laboratory
Address: 221 N. Figueroa St. Room 500, Los Angeles, CA 90012
Telephone: (213) 482-6721 Fax: (213) 482-6554
Engineer: Antonio Maldonado
Email: antonio.maldonado@lacity.org Telephone: (213) 482-7382
Engineer: Isaac Almaraz
Email: isaac.almaraz@lacity.org Telephone: (213) 482-0035
Engineer: Stephanie Lopez
Email: stephanie.j.lopez@lacity.org Telephone: (213) 482-0068
Additional Resources
Find Building Permit-related PDFs and forms here. For more options, visit our Forms and Publications page.
- FAQ
- Forms & Applications
- Publication & Rosters
FAQ Search Results
Filtered categories:
All
Any accessory building shall observe 10 feet separation from the main dwelling unit or any Accessory Living Quarters on the property.
Was this helpful?
A height of a building is limited per the zoning designation of the property. Visit a LADBS office Zoning counter for more information. A building code also limits the height of a building based on the type of construction and the occupancy of the building. Your building will need to comply with the lost restrictive height of the zoning and the building codes.
Was this helpful?
A fence within the required front yard setback for a property is limited to 3.5 feet above the natural grade. The fence height within the required setbacks other than the front yard setbacks could be limited to 6 feet or 8 feet based on the location of the property. A fence in the Special Grading Area of the City is limited to 6 feet above the natural grade within the required side or the rear yard. Check the zoning for your property to see if it is located within the Special Grading Area.
Was this helpful?
The total floor areas of all the accessory buildings on a property can not be larger than the floor area of the main dwelling unit.
Was this helpful?
You can schedule an inspection for the next day, so long as you do so before 4:00 PM.
Was this helpful?
Each permit extension is good for 6 months.
Was this helpful?
A permit is good for two years from the time the permit fees are paid. You will need to call for inspection at least once every 6 months, otherwise the permit expires.
Was this helpful?
Each Plan Check extension is good for 6 months. See the Information Bulletin P/BC 2014-120 for more information.
P/BC 2014-120Was this helpful?
A Plan Check is good for 18 months from the time the plan check fees are paid.
Was this helpful?
Depending upon the labs backlog, it would take about 10 to 15 days for a lab application, and 15 to 20 days for a General Approval (Research Report) to be assigned. After assignment, it would generally take about one to two weeks to get a response. The overall completion of the evaluation and approval depends on the applicant. If the applicant is able to provide a test sample for initial and subsequent reevaluation, submit all the required information and documentations through the evaluation process, the complete process including the test lab evaluation and testing would generally be between 1 to 5 months to get an approval.
Was this helpful?