Mechanical HVAC Inspection
Provides inspection services for all commercial and industrial buildings, and verifies compliance with the Mechanical code.
About Inspection
LADBS is responsible for inspections of all Heating, Ventilation, Air Conditioning, Refrigeration and Fire Life Safety Testing for Mechanical systems, including stairwell pressurization and smoke control smoke evacuation systems installed in all commercial, mixed use and multifamily buildings.
Additional Resources
- Code Amendment
- Forms & Applications
- Request for Modification
Filtered categories:
Supplemental Plan Check Correction Sheet For Curtain Wall Design (2020 LABC)
PC/STR/Corr.Lst.037-2020
Supplemental Correction Sheet Curtain Wall (2023 LABC)
PC/STR/Corr.Lst.037-2023
Supplemental Structural Correction Sheet for Flexible Diaphragm with Rigid Wall (2014 LABC)
PC/STR/Corr.Lst.038-2014
Supplemental Structural Correction Sheet for Flexible Diaphragm with Rigid Wall (2017 LABC)
PC/STR/Corr.Lst.038-2017
Supplemental Plan Check Correction Sheet for Hillside Construction on Slopes Greater than 33 Percent (2023 LABC)
PC/STR/Corr.Lst.039-2023
Supplemental Plan Check Correction Sheet for Masonry Wall Design (2017 LABC)
PC/STR/Corr.Lst.042-2017
Supplemental Plan Check Correction Sheet for Masonry Wall Design (2020 LABC)
PC/STR/Corr.Lst.042-2020
Supplemental Plan Check Correction Sheet for Masonry Wall Design (2023 LABC)
PC/STR/Corr.Lst.042-2023
Supplemental Plan Check List for Prestress Concrete (2014 LABC)
PC/STR/Corr.Lst.043-2014
Supplemental Plan Check List for Prestress Concrete (2017 LABC)
PC/STR/Corr.Lst.043-2017
Filtered categories:
Supplemental Plan Check Corrections Sheet for Fire District 1 and Very High Fire Hazard Severity Zone (2020 LABC)
PC/STR/Corr.Lst.109-2020
Supplemental Plan Check Corrections Sheet for Fire District 1 and Very High Fire Hazard Severity Zone (2023 LABC)
PC/STR.Corr.Lst.109-2023
Supplemental Plan Check Corrections Sheet for Methane Seepage Regulations (2017 LABC)
PC/STR/Corr.Lst.055-2017
Supplemental Plan Check Corrections Sheet for Security Requirements (2017 LABC)
PC/STR/Corr.Lst.103-2017
Supplemental Plan Check Corrections Sheet for Security Requirements (2017 LABC)
PC/STR/Corr.Lst.103-2017
Supplemental Plan Check List for Chapter 95: Voluntary - Earthquake Hazard Reduction in existing Reinforced Concrete Buildings and Concrete Frame Building with Masonry Fill. (2023 LABC)
PC/STR/Corr.Lst.033-2023
Supplemental Plan Check List for Concrete Shear Wall (2014)
PC/STR/Corr.Lst.034-2014
Supplemental Plan Check List for Concrete Shear Wall (2020)
PC/STR/Corr.Lst.034-2020
Supplemental Plan Check List for Concrete Shear Wall (2023)
PC/STR/Corr.Lst.034-2023
Supplemental Plan Check List for Prestress Concrete (2014 LABC)
PC/STR/Corr.Lst.043-2014