Electrical Inspections
An electrical inspection provides inspection services for all commercial and industrial buildings, and verifies compliance with the electrical code.
About Inspection
The intent of electrical inspection is to ensure compliance with the applicable electrical code in order to reduce personal, and structural electrical hazards.
Also, the inspector ensures that the correct product or equipment has been selected for the job, and verifies the proper installation and compliance with the Departmental approved plans, if applicable.
Additional Resources
- Code Amendment
- Inspection Forms
- Electrical Test Labs
Filtered categories:
Supplemental Correction Sheets for Sewage Ejectors & Sump Pumps
PC/MECH/Corr.Lst.31-2020
Supplemental Correction Sheet for Methane Mitigation Systems (for 2017 Codes)
PC/MECH/Corr.Lst.57-2017
Supplemental Correction Sheet for Methane Mitigation Systems (for 2017 Codes)
PC/MECH/Corr.Lst.57-2017
Supplemental Correction Sheets for Methane Mitigation Systems
PC/MECH/Corr.Lst.57-2020
Plan Check Correction Sheet for Mechanical Systems
PC/MECH/Corr.Lst.58-2023
Supplemental Correction Sheet for Type I and II Kitchen Systems
PC/MECH/Corr.Lst.60-2023
Filtered categories:
Supplemental Correction Sheets for Sewage Ejectors & Sump Pumps
PC/MECH/Corr.Lst.31-2020
Supplemental Correction Sheet for Methane Mitigation Systems (for 2017 Codes)
PC/MECH/Corr.Lst.57-2017
Supplemental Correction Sheet for Methane Mitigation Systems (for 2017 Codes)
PC/MECH/Corr.Lst.57-2017
Supplemental Correction Sheets for Methane Mitigation Systems
PC/MECH/Corr.Lst.57-2020
Plan Check Correction Sheet for Mechanical Systems
PC/MECH/Corr.Lst.58-2023
Supplemental Correction Sheet for Type I and II Kitchen Systems
PC/MECH/Corr.Lst.60-2023
Filtered categories:
Structural Design Guidelines for Non-Ductile Concrete Buildings
IB/P/BC 2023-152
- Effective
Structural Design Guidelines for Steel Moment-Resisting Frames
IB/P/BC 2023-098
- Effective
Structural Design Requirements (Seismic Provisions) for Existing Building Converted to Joint Living and Work Quarters
IB/P/BC 2011-110
- Effective
Structural Monitoring Equipment in Buildings Designed with Nonlinear Response History Procedure
IB/P/BC 2023-117
- Effective
Submittal Requirements for One-Story Addition to Residential Buildings for Over-The-Counter Plan Check
IB/P/GI 2023-020
- Effective