Electrical Inspections
An electrical inspection provides inspection services for all commercial and industrial buildings, and verifies compliance with the electrical code.
About Inspection
The intent of electrical inspection is to ensure compliance with the applicable electrical code in order to reduce personal, and structural electrical hazards.
Also, the inspector ensures that the correct product or equipment has been selected for the job, and verifies the proper installation and compliance with the Departmental approved plans, if applicable.
Additional Resources
- Code Amendment
- Inspection Forms
- Electrical Test Labs
Filtered categories:
Storage Racks Plan Check Correction Sheets (2023 LABC)
PC/STR/Corr.Lst.021-2023
Wireless Telecommunication Facilities Plan Check Correction Sheets (2026 LABC)
PC/STR/Corr.Lst.022-2026
- Effective
Adaptive Reuse Plan Check Correction Sheets (Chapter 85, 2017 LABC)
PC/STR/Corr.Lst.032-2017
Adaptive Reuse Plan Check Correction Sheets (2026 LABC)
PC/STR/Corr.Lst.032-2026
- Effective
Supplemental Plan Check List for Chapter 95: Voluntary - Earthquake Hazard Reduction in existing Reinforced Concrete Buildings and Concrete Frame Building with Masonry Fill. (2026 LABC)
PC/STR/Corr.Lst.033-2026
- Effective
Supplemental Plan Check List for Concrete Shear Wall (2014)
PC/STR/Corr.Lst.034-2014
Supplemental Plan Check List for Concrete Shear Wall (2026)
PC/STR/Corr.Lst.034-2026
- Effective
Supplemental Plan Check Correction Sheet for Concrete Special Moment Resisting Frame (2026 LABC)
PC/STR/Corr.Lst.035-2026
- Effective
Supplementl Concrete Tilt Up Retrofit Plan Check Correction Sheet (2017 LABC)
PC/STR/Corr.Lst.036-2017
Supplemental Concrete Tilt Up Retrofit Plan Check Correction Sheet (2023 LABC)
PC/STR/Corr.Lst.036-2023
Filtered categories:
Storage Racks Plan Check Correction Sheets (2023 LABC)
PC/STR/Corr.Lst.021-2023
Wireless Telecommunication Facilities Plan Check Correction Sheets (2026 LABC)
PC/STR/Corr.Lst.022-2026
- Effective
Adaptive Reuse Plan Check Correction Sheets (Chapter 85, 2017 LABC)
PC/STR/Corr.Lst.032-2017
Adaptive Reuse Plan Check Correction Sheets (2026 LABC)
PC/STR/Corr.Lst.032-2026
- Effective
Supplemental Plan Check List for Chapter 95: Voluntary - Earthquake Hazard Reduction in existing Reinforced Concrete Buildings and Concrete Frame Building with Masonry Fill. (2026 LABC)
PC/STR/Corr.Lst.033-2026
- Effective
Supplemental Plan Check List for Concrete Shear Wall (2014)
PC/STR/Corr.Lst.034-2014
Supplemental Plan Check List for Concrete Shear Wall (2026)
PC/STR/Corr.Lst.034-2026
- Effective
Supplemental Plan Check Correction Sheet for Concrete Special Moment Resisting Frame (2026 LABC)
PC/STR/Corr.Lst.035-2026
- Effective
Supplementl Concrete Tilt Up Retrofit Plan Check Correction Sheet (2017 LABC)
PC/STR/Corr.Lst.036-2017
Supplemental Concrete Tilt Up Retrofit Plan Check Correction Sheet (2023 LABC)
PC/STR/Corr.Lst.036-2023
Filtered categories:
Supplemental Plan Check Correction Sheet for Structural Design - General (2020 LABC)
PC/STR/Corr.Lst.104-2020
Supplemental Plan Check Correction Sheet for Structural Design - General (2023 LABC)
PC/STR/Corr.Lst.104-2023
Supplemental Plan Check Correction Sheet for Two-way Concrete Slab (2017 LABC)
PC/STR/Corr.Lst.045-2017
Supplemental Plan Check Correction Sheet for Two-way Concrete Slab (2020 LABC)
PC/STR/Corr.Lst.045-2020
Supplemental Plan Check Correction Sheet for Two-way Concrete Slab (2023 LABC)
PC/STR/Corr.Lst.045-2023
Supplemental Plan Check Correction Sheet for Unreinforced Masonry (URM) Retrofit (2026 LABC)
PC/STR/Corr.Lst.053-2026
- Effective
Supplemental Plan Check Corrections Sheet for 2016 Building Energy Efficiency Standards
PC/STR/Corr.Lst.102-2016
Supplemental Plan Check Corrections Sheet for Bicycle Parking Ordinance (Effective 3/13/2013)
PC/STR/Corr.Lst.111-2017
Supplemental Plan Check Corrections Sheet for Bicycle Parking Ordinance (Effective 3/13/2013)
PC/STR/Corr.Lst.111-2017
Supplemental Plan Check Corrections Sheet for Fire District 1 and Very High Fire Hazard Severity Zone (2017 LABC)
PC/STR/Corr.Lst.109-2017