Electrical Inspections
An electrical inspection provides inspection services for all commercial and industrial buildings, and verifies compliance with the electrical code.
About Inspection
The intent of electrical inspection is to ensure compliance with the applicable electrical code in order to reduce personal, and structural electrical hazards.
Also, the inspector ensures that the correct product or equipment has been selected for the job, and verifies the proper installation and compliance with the Departmental approved plans, if applicable.
Additional Resources
- Code Amendment
- Inspection Forms
- Electrical Test Labs
Filtered categories:
Non-Residential Mandatory Measures for New Construction
PC/GRN/Corr.Lst.02-2014
- Effective
Non-Residential Mandatory Measures for New Construction
PC/GRN/Corr.Lst.02-2016(effective 2016-06-06)
- Effective
Non-Residential Mandatory Measures for New Construction
PC/GRN/Corr.Lst.02-2014
- Effective
NOTAS GENERALES PARA VIVIENDAS UNIFAMILIARES
IB/P/GI 2014-022 General Notes for Single-Family Dwellings
Notice to Contractors Insurance and License Requirements
IB/P/GI 2023-001
- Effective
Notification of Alternate Method of Grading or Construction (for 2011 Codes)
PC/GRAD/Aff05-2009
Nuclear Devices for Soil Density and Moisture Determination
IB/P/BC 2023-028
- Effective
NUEVO TECHADO CERTIFICADO DE CUMPLIMIENTO
IN/Form.012 Re-Roofing Certificate
Filtered categories:
Non-Residential Mandatory Measures for New Construction
PC/GRN/Corr.Lst.02-2014
- Effective
Non-Residential Mandatory Measures for New Construction
PC/GRN/Corr.Lst.02-2016(effective 2016-06-06)
- Effective
Non-Residential Mandatory Measures for New Construction
PC/GRN/Corr.Lst.02-2014
- Effective
NOTAS GENERALES PARA VIVIENDAS UNIFAMILIARES
IB/P/GI 2014-022 General Notes for Single-Family Dwellings
Notice to Contractors Insurance and License Requirements
IB/P/GI 2023-001
- Effective
Notification of Alternate Method of Grading or Construction (for 2011 Codes)
PC/GRAD/Aff05-2009
Nuclear Devices for Soil Density and Moisture Determination
IB/P/BC 2023-028
- Effective
NUEVO TECHADO CERTIFICADO DE CUMPLIMIENTO
IN/Form.012 Re-Roofing Certificate
Filtered categories:
Non-Residential Mandatory Measures for New Construction
PC/GRN/Corr.Lst.02-2014
- Effective
Non-Residential Mandatory Measures for New Construction
PC/GRN/Corr.Lst.02-2016(effective 2016-06-06)
- Effective
Non-Residential Mandatory Measures for New Construction
PC/GRN/Corr.Lst.02-2014
- Effective
NOTAS GENERALES PARA VIVIENDAS UNIFAMILIARES
IB/P/GI 2014-022 General Notes for Single-Family Dwellings
Notice to Contractors Insurance and License Requirements
IB/P/GI 2023-001
- Effective
Notification of Alternate Method of Grading or Construction (for 2011 Codes)
PC/GRAD/Aff05-2009
Nuclear Devices for Soil Density and Moisture Determination
IB/P/BC 2023-028
- Effective
NUEVO TECHADO CERTIFICADO DE CUMPLIMIENTO
IN/Form.012 Re-Roofing Certificate