Electrical Inspections
An electrical inspection provides inspection services for all commercial and industrial buildings, and verifies compliance with the electrical code.
About Inspection
The intent of electrical inspection is to ensure compliance with the applicable electrical code in order to reduce personal, and structural electrical hazards.
Also, the inspector ensures that the correct product or equipment has been selected for the job, and verifies the proper installation and compliance with the Departmental approved plans, if applicable.
Additional Resources
- Code Amendment
- Inspection Forms
- Electrical Test Labs
Filtered categories:
Supplemental Structural Correction Sheet for Flexible Diaphragm with Rigid Wall (2017 LABC)
PC/STR/Corr.Lst.038-2017
Supplemental Plan Check Correction Sheet for Hillside Construction on Slopes Greater than 33 Percent (2023 LABC)
PC/STR/Corr.Lst.039-2023
Supplemental Plan Check Correction Sheet for Masonry Wall Design (2017 LABC)
PC/STR/Corr.Lst.042-2017
Supplemental Plan Check Correction Sheet for Masonry Wall Design (2020 LABC)
PC/STR/Corr.Lst.042-2020
Supplemental Plan Check Correction Sheet for Masonry Wall Design (2023 LABC)
PC/STR/Corr.Lst.042-2023
Supplemental Plan Check List for Prestress Concrete (2014 LABC)
PC/STR/Corr.Lst.043-2014
Supplemental Plan Check List for Prestress Concrete (2017 LABC)
PC/STR/Corr.Lst.043-2017
Supplemental Plan Check List for Prestress Concrete (2023 LABC)
PC/STR/Corr.Lst.043-2023
Supplemental Structural Correction Sheet Steel Brace Frame Design (2014 LABC)
PC/STR/Corr.Lst.044-2014
Supplemental Structural Correction Sheet Steel Brace Frame Design (2017 LABC)
PC/STR/Corr.Lst.044-2017
Filtered categories:
Supplemental Structural Correction Sheet for Flexible Diaphragm with Rigid Wall (2017 LABC)
PC/STR/Corr.Lst.038-2017
Supplemental Plan Check Correction Sheet for Hillside Construction on Slopes Greater than 33 Percent (2023 LABC)
PC/STR/Corr.Lst.039-2023
Supplemental Plan Check Correction Sheet for Masonry Wall Design (2017 LABC)
PC/STR/Corr.Lst.042-2017
Supplemental Plan Check Correction Sheet for Masonry Wall Design (2020 LABC)
PC/STR/Corr.Lst.042-2020
Supplemental Plan Check Correction Sheet for Masonry Wall Design (2023 LABC)
PC/STR/Corr.Lst.042-2023
Supplemental Plan Check List for Prestress Concrete (2014 LABC)
PC/STR/Corr.Lst.043-2014
Supplemental Plan Check List for Prestress Concrete (2017 LABC)
PC/STR/Corr.Lst.043-2017
Supplemental Plan Check List for Prestress Concrete (2023 LABC)
PC/STR/Corr.Lst.043-2023
Supplemental Structural Correction Sheet Steel Brace Frame Design (2014 LABC)
PC/STR/Corr.Lst.044-2014
Supplemental Structural Correction Sheet Steel Brace Frame Design (2017 LABC)
PC/STR/Corr.Lst.044-2017
Filtered categories:
Supplemental Plan Check Corrections Sheet for Security Requirements (2017 LABC)
PC/STR/Corr.Lst.103-2017
Supplemental Plan Check Corrections Sheet for Security Requirements (2017 LABC)
PC/STR/Corr.Lst.103-2017
Supplemental Plan Check List for Chapter 95: Voluntary - Earthquake Hazard Reduction in existing Reinforced Concrete Buildings and Concrete Frame Building with Masonry Fill. (2023 LABC)
PC/STR/Corr.Lst.033-2023
Supplemental Plan Check List for Concrete Shear Wall (2014)
PC/STR/Corr.Lst.034-2014
Supplemental Plan Check List for Concrete Shear Wall (2020)
PC/STR/Corr.Lst.034-2020
Supplemental Plan Check List for Concrete Shear Wall (2023)
PC/STR/Corr.Lst.034-2023
Supplemental Plan Check List for Prestress Concrete (2014 LABC)
PC/STR/Corr.Lst.043-2014
Supplemental Plan Check List for Prestress Concrete (2017 LABC)
PC/STR/Corr.Lst.043-2017
Supplemental Plan Check List for Prestress Concrete (2023 LABC)
PC/STR/Corr.Lst.043-2023
Supplemental Plan Correction Sheet for LA Residential Code Prescriptive Design (2017 LARC)
PC/STR/Corr.Lst.020B-2017