Custodian of Records
Anyone can initiate a request to Public Records. It may include a wide variety of documents and materials (including print, photographic, and electronic formats) that were created or obtained by the LADBS.
About the Program
The California State Legislature adopted the Public Records Act in 1968. It is designed to give the public access to information in the possession of public agencies. The Act also provides that public records shall be open for inspection during regular office hours of the agency. The public can inspect or receive a copy of any record unless the record is exempted from disclosure under the act.
Additional Resources
- FAQ
FAQ Search Results
Filtered categories:
All
- The project is in a commercial building; and
- The project is above the ground floor; and
- The project must have no changes in use; and
- The project must have no changes to the exit components; and
- The project must have no increase in occupant load.
Was this helpful?
When you receive an Order To Comply (OTC) stating that your property violates Code, read the order carefully to identify which items:
- require a permit
- find contact information for the inspector or supervisor
- determine what fees maybe applied and penalties if not paid on time
- determine appeal procedures
The current property owner is responsible for complying with the Order, even if previous owners or tenants have performed the un-permitted work or created the violation.
Refer to the Obtaining Permits to Resolve Orders (.pdf) information bulletin for more detail.
Was this helpful?
The property owner must hire an engineer or architect licensed in the state of California to evaluate the strength of the building. The engineer or architect must then develop plans for the building’s seismic strengthening in compliance with this program. The owner must notify tenants in writing per HCIDLA regulations.
Was this helpful?
The property owner must hire an engineer or architect licensed in the state of California to evaluate the strength of the building. The engineer or architect must then develop plans for the building’s seismic strengthening in compliance with this program. The owner must notify tenants in writing per HCIDLA regulations.
Was this helpful?
- The City Clerk's office will assign a number, date stamp and log in your claim. They will then send it to Building and Safety, Financial Services for review.
- Financial Services staff will also log it in. The refund will be forwarded to the applicable division for refund recommendation. For example, if the refund is for a building permit, requests will be sent to our Plan Check Engineers and our Building Inspectors. Our Department staff will review the refund requests and make appropriate recommendations. These recommendations will be sent back to Financial Services.
- Financial Services staff will complete the audit on the claim, make the necessary calculations and set up either the refund or the denial letter. When completed, the refund or denial letter will be mailed to the claimant.
Was this helpful?
If you disagree on how the code is being applied to your specific situation, discuss the matter with the Inspector or the Inspector's immediate supervisor.
If the issue is not resolved, you have the right to Appeal to the Board of Building and Safety Commissioners. Further information on Appeal rights are on the Order.
Was this helpful?
Exceptions for products without proper approval are considered by the Structural Plan Check Division. See your plan checker and plan check supervisor regarding the process and fees required for an administrative approval.
Was this helpful?
The aim of LADBS Code Enforcement is to preserve and enhance the safety, appearance and economic stability of our community through the diligent enforcement of applicable ordinances and land use regulations. It maintains Los Angeles Municipal Codes (LAMC) by issuing an Order to Comply (OTC) to the property owner and any other person in control of a property who violates or causes or permits another person to violate any provision or requirement of the LAMC.
The OTC is essentially a warning letter with a time frame for voluntary compliance. The OTC describes the violation(s), instructions to remedy the violation(s) and warnings of possible penalty fees and criminal prosecution. Violation of the LAMC is a misdemeanor and code enforcement cases must therefore be prepared for the possibility of being resolved in Los Angeles Superior Court.
Read more about LADBS Code Enforcement.
Was this helpful?
“ASHRAE Guideline 0.2-2015 Commissioning Process for Existing Systems and Assemblies”
requires the following items as part of Retro-Commissioning:
- Define Owner’s EBCx goals and objectives.
- Select the Initial EBCx Team.
- Collect and analyze historical energy use.
- Study the building and its operational characteristics with regard to energy use, occupant health and productivity, and equipment and structural reliability and longevity.
- Develop CFR
- Review building documentation such as building plans, specifications, O&M manuals, and maintenance records.
- Perform diagnostic monitoring and establish trend logs to documents building performance for several weeks.
- Visually inspect systems for correct installation and operation.
- Perform simple repairs required to keep equipment operating, reduce energy use, and allow more accurate data gathering such as trend logging.
- Perform functional tests.
- Identify potential modifications that will reduce energy use and/or cost (includes a descriptions of the measure, estimated energy savings, cost estimate, and simple payback).
- Perform an engineering and economic analysis of potential modifications.
- Prepare a rank-ordered list of appropriate modifications.
- Implement recommended modifications.
- Prepare the draft EBCx Report, which includes the Implementation Report.
- Revise O&M procedures to improve efficiency and equipment longevity.
- Update facility personnel training programs for current and revised systems. Implement retraining of O&M staff as required.
- Transition to Ongoing Commissioning (OCx) with the OCx Plan. Ensure persistence of benefits with measurement and verification (M&V) strategies such as trend logging and monitoring.
- Prepare the final EBCx Report, including the Lessons Learned Report.
Definitions:
CFR: Current Facility Requirements
EBCx: Existing-Building Commissioning
M&V: Measurement and Verification
OCx: Ongoing Commissioning
O&M: Operation and Maintenance
Was this helpful?
”ASHRAE Guideline 0.2-2015 Commissioning Process for Existing Systems and Assemblies” requires the following items as part of the Audit:
- Convene kick-off meeting to form team. Develop a procedural plan.
- Collect and analyze historical energy use.
- Study the building and its operational characteristics with regard to energy use.
- Identify potential modifications that will reduce energy use and/or cost (includes a description of the measure, estimated energy savings, cost estimate, and simple payback).
- Perform an engineering and economic analysis of potential modifications.
- Prepare a rank-ordered list of appropriate modifications.
- Prepare a report to document the analysis process and results.
Was this helpful?