Regular Plan Check
Permits for large complex projects are issued through a Regular Plan Check process.
Additional Information
The plans are reviewed and then returned within weeks depending on workload. With 50% more of the plan check fee paid, the plan check review will be expedited.
Regular Plan Checks are processed at our Metro, Van Nuys, and W.L.A. locations, although plans may be submitted to any Development Services Center. Plans are assigned within a few days of submittal.
Additional Resources
- Information Bulletins
Filtered categories:
Non-potable Rainwater Catchment System Correction Sheet
PC/MECH/Corr.Lst.109-2017
Non-potable Rainwater Catchment System Correction Sheet
PC/MECH/Corr.Lst.109-2017
Non-potable Water Reuse (Recycled) Correction Sheet (for 2017 Codes)
PC/MECH/Corr.Lst.110-2017
Non-potable Water Reuse (Recycled) Correction Sheet (for 2017 Codes)
PC/MECH/Corr.Lst.110-2017
Plan Check Correction Sheet for Plumbing Systems (2023)
PC/MECH/Corr.Lst.111-2023
Plan Check Correction Sheet for Methane Mitigation Systems (2023)
PC/MECH/Corr.Lst.112-2023
Plan Check Correction Sheet for Non-potable Water Reuse (2023)
PC/MECH/Corr.Lst.113-2023
Supplemental Correction List for Type I Kitchen Hoods
PC/MECH/Corr.Lst.114-2014
Plan Check Correction Sheet for Non-potable Rainwater Catchment System (2023)
PC/MECH/Corr.Lst.114-2023