Regular Plan Check
Permits for large complex projects are issued through a Regular Plan Check process.
Additional Information
The plans are reviewed and then returned within weeks depending on workload. With 50% more of the plan check fee paid, the plan check review will be expedited.
Regular Plan Checks are processed at our Metro, Van Nuys, and W.L.A. locations, although plans may be submitted to any Development Services Center. Plans are assigned within a few days of submittal.
Additional Resources
- Information Bulletins
Filtered categories:
Office of Statewide Health and Planning Department Requirements (OSHPD 3) Supplemental Plan Check Correction Sheet (2017 LABC)
PC/STR/Corr.Lst.113-2017
Supplemental Plan Check Corrections Sheet for Fire District 1 and Very High Fire Hazard Severity Zone (2017 LABC)
PC/STR/Corr.Lst.109-2017
Supplemental Structural Correction Sheet Steel Brace Frame Design (2017 LABC)
PC/STR/Corr.Lst.044-2017
Storage Racks Plan Check Correction Sheets (2020 LABC)
PC/STR/Corr.Lst.021-2020
Supplemental Plan Check List for Concrete Shear Wall (2020)
PC/STR/Corr.Lst.034-2020
Supplemental Plan Check Correction Sheet For Concrete Special Moment Resisting Frame (2020 LABC)
PC/STR/Corr.Lst.035-2020
Supplemental Structural Correction Sheet for Flexible Diaphragm with Rigid Wall (2017 LABC)
PC/STR/Corr.Lst.038-2017
Supplemental Plan Check List for Prestress Concrete (2017 LABC)
PC/STR/Corr.Lst.043-2017
Supplemental Plan Check Corrections Sheet for Methane Seepage Regulations (2017 LABC)
PC/STR/Corr.Lst.055-2017
Supplemental Plan Check Corrections Sheet for Bicycle Parking Ordinance (Effective 3/13/2013)
PC/STR/Corr.Lst.111-2017