Regular Plan Check
Permits for large complex projects are issued through a Regular Plan Check process.
Additional Information
The plans are reviewed and then returned within weeks depending on workload. With 50% more of the plan check fee paid, the plan check review will be expedited.
Regular Plan Checks are processed at our Metro, Van Nuys, and W.L.A. locations, although plans may be submitted to any Development Services Center. Plans are assigned within a few days of submittal.
Additional Resources
- Information Bulletins
Filtered categories:
Supplemental Plan Check Correction Sheet for Structural Design - General (2023 LABC)
PC/STR/Corr.Lst.104-2023
Supplemental Plan Check Correction Sheet for Unreinforced Masonry (URM) Retrofit (2023 LABC)
PC/STR/Corr.Lst.053-2023
Supplemental Plan Check Corrections Sheet for Fire District 1 and Very High Fire Hazard Severity Zone (2023 LABC)
PC/STR.Corr.Lst.109-2023
Supplemental Plan Check List for Chapter 95: Voluntary - Earthquake Hazard Reduction in existing Reinforced Concrete Buildings and Concrete Frame Building with Masonry Fill. (2023 LABC)
PC/STR/Corr.Lst.033-2023
Supplemental Plan Check List for Concrete Shear Wall (2023)
PC/STR/Corr.Lst.034-2023
Supplemental Plan Check List for Prestress Concrete (2023 LABC)
PC/STR/Corr.Lst.043-2023
Supplemental Structural Correction Sheet Steel Brace Frame Design (2023 LABC)
PC/STR/Corr.Lst.044-2023
Swimming Pools Plan Check Correction Sheets (2023 LABC)
PC/STR/Corr.Lst.108-2023
Wireless Telecommunication Facilities Plan Check Correction Sheets (2023 LABC)
PC/STR/Corr.Lst.022-2023
City of Los Angeles Electrical Plan Check Correction List 2020
PC/ELEC/Corr.Lst.08-2020