Regular Plan Check
Permits for large complex projects are issued through a Regular Plan Check process.
Additional Information
The plans are reviewed and then returned within weeks depending on workload. With 50% more of the plan check fee paid, the plan check review will be expedited.
Regular Plan Checks are processed at our Metro, Van Nuys, and W.L.A. locations, although plans may be submitted to any Development Services Center. Plans are assigned within a few days of submittal.
Additional Resources
- Information Bulletins
Filtered categories:
Storage Racks Plan Check Correction Sheets (2023 LABC)
PC/STR/Corr.Lst.021-2023
Wireless Telecommunication Facilities Plan Check Correction Sheets (2026 LABC)
PC/STR/Corr.Lst.022-2026
- Effective
Adaptive Reuse Plan Check Correction Sheets (Chapter 85, 2017 LABC)
PC/STR/Corr.Lst.032-2017
Adaptive Reuse Plan Check Correction Sheets (2026 LABC)
PC/STR/Corr.Lst.032-2026
- Effective
Supplemental Plan Check List for Chapter 95: Voluntary - Earthquake Hazard Reduction in existing Reinforced Concrete Buildings and Concrete Frame Building with Masonry Fill. (2026 LABC)
PC/STR/Corr.Lst.033-2026
- Effective
Supplemental Plan Check List for Concrete Shear Wall (2014)
PC/STR/Corr.Lst.034-2014
Supplemental Plan Check List for Concrete Shear Wall (2026)
PC/STR/Corr.Lst.034-2026
- Effective
Supplemental Plan Check Correction Sheet for Concrete Special Moment Resisting Frame (2026 LABC)
PC/STR/Corr.Lst.035-2026
- Effective
Supplementl Concrete Tilt Up Retrofit Plan Check Correction Sheet (2017 LABC)
PC/STR/Corr.Lst.036-2017
Supplemental Concrete Tilt Up Retrofit Plan Check Correction Sheet (2023 LABC)
PC/STR/Corr.Lst.036-2023