Permits for simple projects, which do not require plan check, are readily issued as Express Permits or e-permits when done online.
All contractors must complete a subcontractor form providing information on any subcontractors used on the project. This form must be returned to the Office of Finance
Filtered categories:
You can request the staff's immediate supervisor to discuss the matter further.
Was this helpful?
The district grading inspector will clear the release of the bond upon completion of the work. Financial Services will release the bond amount.
Was this helpful?
The automated inspection request systems allow inspections to be requested only three days in advance. Call the Customer Call Center at 3-1-1 if you need to request an inspection more than three days in advance.
Was this helpful?
Sites in most hillside areas, within potentially liquefiable zones, where infiltration rates are too low, or where the earth materials exhibit adverse conditions when saturated (e.g., expansive or hydro collapsible soils) are generally not allowed to infiltrate stormwater. Please refer to Information Bulletin P/BC 2014-118.
Was this helpful?
Building and Safety does not maintain copies of Plumbing or Electrical plans.
Was this helpful?
A fault investigation is required if the project is located within an Alquist-Priolo Earthquake Fault Zone or a Preliminary Fault Rupture Study Area to preclude construction for human occupancy from being placed on an active fault. Please refer to Information Bulletins P/BC 2014-129 and P/BC 2014-044.
Was this helpful?
The Department requires the use of a sump pump when concentrated drainage cannot be directed to an approved location via gravity. Please refer to Information Bulletin P/BC 2014-103.
Was this helpful?
The Department requires the use of a back-up generator for sloping properties to maintain proper drainage and reduce the potential for erosion and sloughing in the event of a power failure.
Was this helpful?
No, a CofO will only be issued if it is a change of occupancy or an increase in square footage.
Was this helpful?
Whenever an Order to Comply is issued you will be billed $336.00, plus a 6% surcharge fee.
Was this helpful?