Permits for simple projects, which do not require plan check, are readily issued as Express Permits or e-permits when done online.
All contractors must complete a subcontractor form providing information on any subcontractors used on the project. This form must be returned to the Office of Finance
Filtered categories:
Yes
Was this helpful?
No, the LAMC does not permit deviations from development standards provided in LAMC 12.22 A.33 (Exceptions) because these provisions are already exceptions from the Code; however, an ADU may request the appropriate entitlement(s) to deviate from development standards provided in other sections of the Code that are not specifically defined in LAMC 12.22 A.33.
Was this helpful?
A homeowner can obtain a permit and do the construction, alteration or repair on his/her house and accessory buildings or facilities thereto, if the owner resides or will reside in the dwelling.
Read more on our "About the Construction Process" page.
Was this helpful?
Yes, the plans may be purchased directly from the plan owner.
Was this helpful?
Members of the public may address the BBSC during the appropriate time scheduled on the agenda (usually at the end of the hearing); however, the BBSC will not take any action on an item that is not on the current agenda.
Was this helpful?
For General Approval – City of Los Angeles only:
Testing must be witnessed by an independent third party Testing Agency approved by the Los Angeles City, Department of Building and Safety (LADBS). The Approved Testing Agency shall issue the test report. The Approved Testing Agency shall approve the testing facility where the testing occurs to meet the requirements as specified in Information Bulletin P/GI 2014-028, Rules and Regulations for Recognition of Testing Agencies.
For Research Reports based on an Evaluation Report from a nationally recognized model code agency:
Test reports shall come from a qualified testing agency approved by the Model Code Agency issuing the Evaluation Report. The approved testing agency shall take necessary steps to ensure that the integrity and condition of the test specimens are maintained and are not altered during periods when a laboratory representative is not present. Also, the manufacturer’s testing facility shall show to the satisfaction of the approved testing agency that it meets the requirements for an approved testing agency.
Was this helpful?
No. These pre-approved ADU Standard Plans are only for new, detached structures.
Was this helpful?
Please contact the individual jurisdiction to inquire whether they will accept a City of Los Angeles Pre-Approved Standard Plan.
Was this helpful?
No, these pre-approved ADU Standard Plans are only for new, detached structures.
Was this helpful?
Yes, the Lot may contain any other residential use(s), in addition to the non-residential uses and accessory residential uses mentioned in 12.22 A.33(c)(6)
Was this helpful?