Permits for simple projects, which do not require plan check, are readily issued as Express Permits or e-permits when done online.
All contractors must complete a subcontractor form providing information on any subcontractors used on the project. This form must be returned to the Office of Finance
Filtered categories:
When the work is ready, request an inspection using one of three options:
For requests of four (4) or more seismic gas shut off valve inspections, please complete the Seismic Gas Shut Off Valve Inspection Request Form. To schedule fewer than four (4) seismic gas shut off valve inspections, please call 3-1-1 for inside Los Angeles County or (213) 473-3231 for outside Los Angeles County.
Deputy Inspection notification may be made by calling 3-1-1 or by completing a Deputy Fax Notification form and faxing it to (213) 482-6838 or 6839 by 3:30 pm one working day before the day of the inspection. Deputy Inspection Notification is not currently available on the Automated Inspection Request form.
Was this helpful?
To request for inspection, please call (888) LA4Build or request for inspection online.
Was this helpful?
To request for inspection, please call (888) LA4Build or request for inspection online.
Was this helpful?
You can review the past and present activity on a particular property with our free online Permit and Inspection Report. It shows both Permit activity and Code Enforcement activity.
Was this helpful?
The fire water storage tank is sized according to the sprinkler or standpipe demand, whichever is larger for the water supply duration as stated in NFPA 13 table 11.2.3.1.2
Was this helpful?
Reports must be submitted in person at any construction services center.
Was this helpful?
Only standard solar pv permits currently qualify for online plan check and permit service. See Information Bulletin P/GI 2014-027 for more details. You will find a copy of this bulletin here.
For all other plan review, you are required to visit one of our offices to make a submission.
Was this helpful?
You may submit your plans at any of our three office plan check counters located at Metro, Van Nuys, and WLA Building and Safety offices.
Was this helpful?
Our records go back to the year of 1905.
Was this helpful?