Mechanical HVAC Permits
Mechanical HVAC Permits are required for any installation or modification of heating/cooling systems, smoke control systems, hood and ventilation systems, or engineered water heater/heating appliance vents.
About Mechanical HVAC Permits
Plans shall be filed with and approved by the Department (as an HVAC Plan Check) before any permit is issued for work listed below is started:
- Installations where the aggregate BTU/H input capacity is 500,000 BTU/H (2299.3 L/W) and over, for comfort heating, or for comfort-cooling, or for absorption units for commercial applications
- Installations where the system BTU/H input capacity is 500,000 BTU/H (2299.3 L/W) and over for comfort heating, or for comfort cooling, or for absorption units for residential applications
- Smoke-control systems
- Any comfort-cooling compressor or refrigeration compressor for any system which contains any Group B refrigerant
- Any commercial cooking hood and ventilation system
- Product conveying ventilation systems
- Engineered water heater/heating appliance vents
For more information on the Plan Check process, visit our Express Permit, Regular Plan Check and Counter Plan Check pages.
Additional Resources
- Code Amendment
- Forms & Applications
- Information Bulletins
- Standard Correction Lists
Filtered categories:
Supplemental Plan Review Checklist No. 1 - Elevators, Lulas and Platform Lifts
PC/DAD/Corr.Lst.01-2017
Supplemental Plan Review Checklist No. 1 - Elevators, Lulas and Platform Lifts
PC/DAD/Corr.Lst.01-2020
Supplemental Plan Review Checklist No. 2 - Signs
PC/DAD/Corr.Lst.02-2018
Supplemental Plan Review Checklist No. 2 - Signs
PC/DAD/Corr.Lst.02-2020
Supplemental Plan Review Checklist No. 3 - Restaurant
PC/DAD/Corr.Lst.03-2017
Supplemental Plan Review Checklist No. 3 - Restaurant
PC/DAD/Corr.Lst.03-2020
Supplemental Plan Review Checklist No. 4 - Assembly
PC/DAD/Corr.Lst.04-2017
Supplemental Plan Review Checklist No. 4 - Assembly
PC/DAD/Corr.Lst.04-2020
Supplemental Plan Review Checklist No. 5 - Group B and Group M Occupancies
PC/DAD/Corr.Lst.05-2014
Supplemental Plan Review Checklist No. 5 - Group B and Group M Occupancies
PC/DAD/Corr.Lst.05-2017
Filtered categories:
Procedure for Processing Error or Abuse of Discretion Appeals of LADBS Actions Concerning Zoning Issues
IB/P/ZC 2023-019
Procedure for Processing "Error or Abuse of Discretion" Appeals of LADBS Actions to the Board of Building and Safety Commissioners
IB/P/BC 2023-149
- Effective
Procedures for Hazardous or Contaminated Materials Found during Geological Exploration
IB/P/BC 2023-131
- Effective
Procedures for Recognized Testing Agencies Performing Field Services
IB/P/EC 2020-002
- Effective
Procedures for the Application of ASCE 41-17 to Existing Buildings
IB/P/BC 2023-148
- Effective
Protocol for Retail Establishments Opening for In-Person Shopping: Appendix B
Public Housing - Supplemental Plan Review Checklist No. 9
PC/DAD/Corr.Lst.09-2018
Filtered categories:
Procedure for Processing Error or Abuse of Discretion Appeals of LADBS Actions Concerning Zoning Issues
IB/P/ZC 2023-019
Procedure for Processing "Error or Abuse of Discretion" Appeals of LADBS Actions to the Board of Building and Safety Commissioners
IB/P/BC 2023-149
- Effective
Procedures for Hazardous or Contaminated Materials Found during Geological Exploration
IB/P/BC 2023-131
- Effective
Procedures for Recognized Testing Agencies Performing Field Services
IB/P/EC 2020-002
- Effective
Procedures for the Application of ASCE 41-17 to Existing Buildings
IB/P/BC 2023-148
- Effective
Protocol for Retail Establishments Opening for In-Person Shopping: Appendix B
Public Housing - Supplemental Plan Review Checklist No. 9
PC/DAD/Corr.Lst.09-2018