Mechanical HVAC Permits
Mechanical HVAC Permits are required for any installation or modification of heating/cooling systems, smoke control systems, hood and ventilation systems, or engineered water heater/heating appliance vents.
About Mechanical HVAC Permits
Plans shall be filed with and approved by the Department (as an HVAC Plan Check) before any permit is issued for work listed below is started:
- Installations where the aggregate BTU/H input capacity is 500,000 BTU/H (2299.3 L/W) and over, for comfort heating, or for comfort-cooling, or for absorption units for commercial applications
- Installations where the system BTU/H input capacity is 500,000 BTU/H (2299.3 L/W) and over for comfort heating, or for comfort cooling, or for absorption units for residential applications
- Smoke-control systems
- Any comfort-cooling compressor or refrigeration compressor for any system which contains any Group B refrigerant
- Any commercial cooking hood and ventilation system
- Product conveying ventilation systems
- Engineered water heater/heating appliance vents
For more information on the Plan Check process, visit our Express Permit, Regular Plan Check and Counter Plan Check pages.
Additional Resources
- Code Amendment
- Forms & Applications
- Information Bulletins
- Standard Correction Lists
Filtered categories:
Covid-19 - Emergency Tolling of Deadlines Related to Expiration of Permits and Related Documents
IB/P/GI 2023-033
- Effective
Crack Repair of Unreinforced Masonry Walls with Grout Injection
IB/P/BC 2023-056
- Effective
Cutting, Notching, and Boring of Wood Framing Members
IB/P/BC 2020-007
- Effective
Data Collection, Material Testing and Condition Assessment Requirements for Existing Concrete Buildings
IB/P/BC 2020-153
- Effective
DE ELEVADOR DEL SILLA DE RUEDAS
In/EPV/Form.008 Wheelchair Lift Mechanics
Definition of "Commenced Construction" and Similar Phrases
IB/P/G1 2023-016
- Effective
Definition of "Commenced Construction" and Similar Phrases
IB/P/GI 2020-016
Demand Factor of 0.65 to a Group of Reefer Receptacles
PC/ELEC/Mod08-2017
Demand Factor of 0.65 to a Group of Reefer Receptacles
PC/ELEC/Mod8-2017
Filtered categories:
Covid-19 - Emergency Tolling of Deadlines Related to Expiration of Permits and Related Documents
IB/P/GI 2023-033
- Effective
Crack Repair of Unreinforced Masonry Walls with Grout Injection
IB/P/BC 2023-056
- Effective
Cutting, Notching, and Boring of Wood Framing Members
IB/P/BC 2020-007
- Effective
Data Collection, Material Testing and Condition Assessment Requirements for Existing Concrete Buildings
IB/P/BC 2020-153
- Effective
DE ELEVADOR DEL SILLA DE RUEDAS
In/EPV/Form.008 Wheelchair Lift Mechanics
Definition of "Commenced Construction" and Similar Phrases
IB/P/G1 2023-016
- Effective
Definition of "Commenced Construction" and Similar Phrases
IB/P/GI 2020-016
Demand Factor of 0.65 to a Group of Reefer Receptacles
PC/ELEC/Mod08-2017
Demand Factor of 0.65 to a Group of Reefer Receptacles
PC/ELEC/Mod8-2017
Filtered categories:
Covid-19 - Emergency Tolling of Deadlines Related to Expiration of Permits and Related Documents
IB/P/GI 2023-033
- Effective
Crack Repair of Unreinforced Masonry Walls with Grout Injection
IB/P/BC 2023-056
- Effective
Cutting, Notching, and Boring of Wood Framing Members
IB/P/BC 2020-007
- Effective
Data Collection, Material Testing and Condition Assessment Requirements for Existing Concrete Buildings
IB/P/BC 2020-153
- Effective
DE ELEVADOR DEL SILLA DE RUEDAS
In/EPV/Form.008 Wheelchair Lift Mechanics
Definition of "Commenced Construction" and Similar Phrases
IB/P/G1 2023-016
- Effective
Definition of "Commenced Construction" and Similar Phrases
IB/P/GI 2020-016
Demand Factor of 0.65 to a Group of Reefer Receptacles
PC/ELEC/Mod08-2017
Demand Factor of 0.65 to a Group of Reefer Receptacles
PC/ELEC/Mod8-2017