Mechanical HVAC Permits
Mechanical HVAC Permits are required for any installation or modification of heating/cooling systems, smoke control systems, hood and ventilation systems, or engineered water heater/heating appliance vents.
About Mechanical HVAC Permits
Plans shall be filed with and approved by the Department (as an HVAC Plan Check) before any permit is issued for work listed below is started:
- Installations where the aggregate BTU/H input capacity is 500,000 BTU/H (2299.3 L/W) and over, for comfort heating, or for comfort-cooling, or for absorption units for commercial applications
- Installations where the system BTU/H input capacity is 500,000 BTU/H (2299.3 L/W) and over for comfort heating, or for comfort cooling, or for absorption units for residential applications
- Smoke-control systems
- Any comfort-cooling compressor or refrigeration compressor for any system which contains any Group B refrigerant
- Any commercial cooking hood and ventilation system
- Product conveying ventilation systems
- Engineered water heater/heating appliance vents
For more information on the Plan Check process, visit our Express Permit, Regular Plan Check and Counter Plan Check pages.
Additional Resources
- Code Amendment
- Forms & Applications
- Information Bulletins
- Standard Correction Lists
Filtered categories:
LAFD Requirement 96 Fire Department Reference - Requirements For Rooftop Photovoltaic (PV) Systems on One and Two Family Dwellings
Lamar Outdoor Advertising Inc List pursuant to their Legal Settlement Agreement
LA Soft-story Retrofit Program: Tenant Habitability Plan and Cost Recovery Guide
Filtered categories:
Commissioning Measures In Construction Documents
GRN 22-2020
- Effective
Commissioning Measures In Construction Documents
GRN 22-2023
- Effective
Filtered categories:
Commissioning Measures In Construction Documents
GRN 22-2020
- Effective
Commissioning Measures In Construction Documents
GRN 22-2023
- Effective