Elevator and Pressure Vessel Permits
Elevator and Pressure Vessel Permits are required for the installation or modification of any elevator, lift, dumbwaiter, or escalator.
About Elevator and Pressure Vessel Permits
Except for repairs, plans for installation or modification of any elevator, lift, dumbwaiter, and/or escalator shall be filed with and approved by the Department before any permit is issued, as part of an Elevator/Pressure Vessel Plan Check.
For more information on the Plan Check process, visit our Express Permit, Regular Plan Check and Counter Plan Check pages.
Additional Resources
- Code Amendment
- Forms & Applications
- Information Bulletins
- Requests for Modifications
Filtered categories:
Supplemental Correction Sheets for Garage Ventilation System (for 2017 Codes)
PC/MECH/Corr.Lst.29-2017
Supplemental Correction Sheets for Pump Systems (Domestic or Fire) (2017 LAPC & 2016 NFPA-20)
PC/MECH/Corr.Lst.30-2017
Supplemental Correction Sheets for Pump Systems (Domestic or Fire)
PC/MECH/Corr.Lst.30-2020
Supplemental Correction Sheets for Sewage Ejectors & Sump Pumps (for 2017 Codes)
PC/MECH/Corr.Lst.31-2017
Supplemental Correction Sheets for Sewage Ejectors & Sump Pumps
PC/MECH/Corr.Lst.31-2020
Supplemental Correction Sheet for Methane Mitigation Systems (for 2017 Codes)
PC/MECH/Corr.Lst.57-2017
Supplemental Correction Sheet for Methane Mitigation Systems (for 2017 Codes)
PC/MECH/Corr.Lst.57-2017
Supplemental Correction Sheets for Methane Mitigation Systems
PC/MECH/Corr.Lst.57-2020
Plan Check Correction Sheet for Mechanical Systems
PC/MECH/Corr.Lst.58-2023
Supplemental Correction Sheet for Type I and II Kitchen Systems
PC/MECH/Corr.Lst.60-2023
Filtered categories:
Structural Criteria for Residential Rooftop Solar Energy Installations
Structural Criteria for Residential Rooftop Solar Energy Installations
Structural Design Guidelines for Non-Ductile Concrete Buildings
IB/P/BC 2023-152
- Effective
Structural Design Guidelines for Steel Moment-Resisting Frames
IB/P/BC 2023-098
- Effective
Structural Design Requirements (Seismic Provisions) for Existing Building Converted to Joint Living and Work Quarters
IB/P/BC 2011-110
- Effective
Structural Monitoring Equipment in Buildings Designed with Nonlinear Response History Procedure
IB/P/BC 2023-117
- Effective
Filtered categories:
Structural Criteria for Residential Rooftop Solar Energy Installations
Structural Criteria for Residential Rooftop Solar Energy Installations
Structural Design Guidelines for Non-Ductile Concrete Buildings
IB/P/BC 2023-152
- Effective
Structural Design Guidelines for Steel Moment-Resisting Frames
IB/P/BC 2023-098
- Effective
Structural Design Requirements (Seismic Provisions) for Existing Building Converted to Joint Living and Work Quarters
IB/P/BC 2011-110
- Effective
Structural Monitoring Equipment in Buildings Designed with Nonlinear Response History Procedure
IB/P/BC 2023-117
- Effective