Elevator and Pressure Vessel Permits
Elevator and Pressure Vessel Permits are required for the installation or modification of any elevator, lift, dumbwaiter, or escalator.
About Elevator and Pressure Vessel Permits
Except for repairs, plans for installation or modification of any elevator, lift, dumbwaiter, and/or escalator shall be filed with and approved by the Department before any permit is issued, as part of an Elevator/Pressure Vessel Plan Check.
For more information on the Plan Check process, visit our Express Permit, Regular Plan Check and Counter Plan Check pages.
Additional Resources
- Code Amendment
- Forms & Applications
- Information Bulletins
- Requests for Modifications
Filtered categories:
Maintenance of Uncertified Fill Underground Structures (for 2011 Codes)
PC/GRAD/Aff04-2008
Notification of Alternate Method of Grading or Construction (for 2011 Codes)
PC/GRAD/Aff05-2009
Maintenance of Buildings in Areas Subject to Surface Fault Rupture and or Severe Ground Shaking (for 2011 Codes)
PC/GRAD/Aff07-2009
Maintenance Affidavit for Sump Pump with Natural Gas Back-up Generator
PC/GRAD/Aff09-2015
Filtered categories:
Retaining or Slough Wall (4 foot High or Less)
IB/P/BC 2023-002
- Effective
Roofing Requirements for Wood Shakes and Shingles
IB/P/BC 2017-013
- Effective
Roofing Requirements For Wood Shakes and Shingles
IB/P/BC 2023-013
- Effective
Rules and Regulations for Hillside Exploratory Work Rules
IB/P/BC 2023-068
- Effective
Rules and Regulations for LADBS Testing Laboratories
IB/P/EC 2020-005
- Effective
Rules and Regulations for LADBS Testing Laboratories
IB/P/EC 2017-005
- Effective
Rules and Regulations for Recognition of Testing Agencies
IB/P/GI 2020-028
Safety Test - Cabled Elevators Installed After October 25, 1998 Five Year (Group III and IV)
IN/EPV/Form03-2016
Filtered categories:
Retaining or Slough Wall (4 foot High or Less)
IB/P/BC 2023-002
- Effective
Roofing Requirements for Wood Shakes and Shingles
IB/P/BC 2017-013
- Effective
Roofing Requirements For Wood Shakes and Shingles
IB/P/BC 2023-013
- Effective
Rules and Regulations for Hillside Exploratory Work Rules
IB/P/BC 2023-068
- Effective
Rules and Regulations for LADBS Testing Laboratories
IB/P/EC 2020-005
- Effective
Rules and Regulations for LADBS Testing Laboratories
IB/P/EC 2017-005
- Effective
Rules and Regulations for Recognition of Testing Agencies
IB/P/GI 2020-028
Safety Test - Cabled Elevators Installed After October 25, 1998 Five Year (Group III and IV)
IN/EPV/Form03-2016