Electrical Permits
Electrical Permits are required for any electrical work.
About Electrical Permits
Electrical plans shall be filed with and approved by the Department (as an Electrical Plan Check) before any permit is issued for work related to the following:
- Theaters or motion picture theaters
- Places of assembly
- All health care facilities within the scope of Article 517 of the C.E.C.
- A new building or an addition to a building if the computed area exceeds 30,000 square feet (2,787 m2), any installation if the total load exceeds 400 amperes, or the installation of equipment rated 600 amperes or more. The computed area shall be the sum of the areas on each floor bounded by the outside surfaces of the exterior walls and shall include floor areas beneath building projections which extend more than 6 feet (1829 mm).
- All electrical installations over 600 volts.
- Installation in locations classified as hazardous locations, unless otherwise satisfactory to the Department.
- Projects which include the installation of exit signs, egress lighting or security lighting.
- Installation of a complicated electrical system as determined by the Department, such as, Emergency, Legally Required Standby, Fire Alarm, and Gas Detection Systems, except for the following:
- The addition of strobe power supplies and their attached devices connected to any existing fire control unit or panel.
- The installation of special extinguishing, central station monitoring systems, dialers, and their attached devices.
- The addition of any fire warning devices connected to an existing programmable fire warning system.
- Installation of lighting fixtures weighing more than 300 pounds.
- Installation of electrical devices, equipment and lighting systems subject to the California Energy Code
For more information on the Plan Check process, visit our Express Permit, Regular Plan Check and Counter Plan Check pages.
Note: San Pedro, South L.A. and West L.A. offices do not have Electrical Plan Check services at this time.
Additional Resources
- Code Amendment
- Forms & Applications
- Information Bulletins
- Requests for Modifications
- Standard Correction Lists
Filtered categories:
MANDATORY REQUIREMENTS CHECKLIST NEWLY CONSTRUCTED RESIDENTIAL BUILDINGS
GRN 4-2016
WATER CONSERVATION ORDINANCE NOTES NON-RESIDENTIAL BUILDINGS
GRN 18N-2016
WATER CONSERVATION NOTES - ORDINANCE #184248 RESIDENTIAL BUILDINGS
GRN 18R-2016
MANDATORY REQUIREMENTS CHECKLIST ADDITIONS AND ALTERATIONS TO NON-RESIDENTIAL BUILDINGS
GRN 10-2015
MANDATORY REQUIREMENTS CHECKLIST ADDITIONS AND ALTERATIONS TO RESIDENTIAL BUILDINGS
GRN 9-2015
MANDATORY REQUIREMENTS CHECKLIST ADDITIONS AND ALTERATIONS TO RESIDENTIAL BUILDINGS
GRN 9-2014
MANDATORY REQUIREMENTS CHECKLIST NEWLY CONSTRUCTED NON-RESIDENTIAL BUILDINGS
GRN 5-2015
MANDATORY REQUIREMENTS CHECKLIST NEWLY CONSTRUCTED RESIDENTIAL BUILDINGS
GRN 4-2014
Filtered categories:
Can I get plan check approval before getting the gas service letter from the gas company?
Can I have a special Event if there is no Certificate of Occupancy for the building?
Can I install a master PRV downstream of the fire pump in a sprinkler system?
Can I install a stormwater infiltration system in a lot within a Hillside Grading Area?
Can I install a stormwater infiltration system in a lot within a potentially liquefiable hazard zone?
Filtered categories:
Accessibility Details for Tubs and Showers
IB/P/BC 2020-088
- Effective
Accessory Dwelling Unit (ADU) Correction Sheet
PC/STR/Corr.Lst.020A1-2019
Accessory Dwelling Unit (ADU), Junior Accessory Dwelling Unit (JADU), Movable Tiny House (MTH) Correction Sheet (2020 LABC)
PC/STR/Corr.Lst.020A-2020
Accessory Dwelling Unit (ADU), Junior Accessory Dwelling Unit (JADU), Movable Tiny House (MTH) Correction Sheet (2023 LABC)
PC/STR/Corr.Lst.020A-2023
Access Requirements to Mechanical Equipment Located on Roofs of Buildings
IB/P/MC 2023-006
- Effective
Access Requirements to Mechanical Equipment Located on Roofs of Buildings
IB/P/MC 2020-06
- Effective
Filtered categories:
Can I get plan check approval before getting the gas service letter from the gas company?
Can I have a special Event if there is no Certificate of Occupancy for the building?
Can I install a master PRV downstream of the fire pump in a sprinkler system?
Can I install a stormwater infiltration system in a lot within a Hillside Grading Area?
Can I install a stormwater infiltration system in a lot within a potentially liquefiable hazard zone?