Electrical Permits
Electrical Permits are required for any electrical work.
About Electrical Permits
Electrical plans shall be filed with and approved by the Department (as an Electrical Plan Check) before any permit is issued for work related to the following:
- Theaters or motion picture theaters
- Places of assembly
- All health care facilities within the scope of Article 517 of the C.E.C.
- A new building or an addition to a building if the computed area exceeds 30,000 square feet (2,787 m2), any installation if the total load exceeds 400 amperes, or the installation of equipment rated 600 amperes or more. The computed area shall be the sum of the areas on each floor bounded by the outside surfaces of the exterior walls and shall include floor areas beneath building projections which extend more than 6 feet (1829 mm).
- All electrical installations over 600 volts.
- Installation in locations classified as hazardous locations, unless otherwise satisfactory to the Department.
- Projects which include the installation of exit signs, egress lighting or security lighting.
- Installation of a complicated electrical system as determined by the Department, such as, Emergency, Legally Required Standby, Fire Alarm, and Gas Detection Systems, except for the following:
- The addition of strobe power supplies and their attached devices connected to any existing fire control unit or panel.
- The installation of special extinguishing, central station monitoring systems, dialers, and their attached devices.
- The addition of any fire warning devices connected to an existing programmable fire warning system.
- Installation of lighting fixtures weighing more than 300 pounds.
- Installation of electrical devices, equipment and lighting systems subject to the California Energy Code
For more information on the Plan Check process, visit our Express Permit, Regular Plan Check and Counter Plan Check pages.
Note: San Pedro, South L.A. and West L.A. offices do not have Electrical Plan Check services at this time.
Additional Resources
- Code Amendment
- Forms & Applications
- Information Bulletins
- Requests for Modifications
- Standard Correction Lists
Filtered categories:
Use a Scale per Foot Smaller than 0.125 Inch for Site Utility Drawing
PC/ELEC/Mod16-2017
Installation of Equipment Prior to Test Lab Approval
PC/ELEC/Mod13-2017
Demand Factor of 0.65 to a Group of Reefer Receptacles
PC/ELEC/Mod8-2017
Baseline Hillside Ordinance Correction Sheet (Ordinance No. 184,802 Effective 3/17/17)
PC/STR/Corr.Lst.107A-2017
Filtered categories:
Los Angeles City Research Reports are allowed to be based on an Evaluation Report from a Nationally Recognized Model Code Agency. Who are Nationally Recognized Model Code Agencies currently accepted by LADBS Building Research Section?
May an ADU be created on a Lot that is a substandard Lot (for instance, due to an illegal Lot split in the past)?
May I get my restaurant permit before obtaining my Health Department approval?
My neighbor is excavation close to my property line. What can I do to protect my property?
Once a standard plan is selected, how does a customer indicate the use of the standard plan on the LADBS permit application?
The Department of Building and Safety sent me a Notice of Hearing regarding someone else's property. Why did I receive this?
The equipment has not been built yet. Can you approve the design of the equipment?
Filtered categories:
Document Submittal Requirements for a New Multi-Family Dwelling
IB/P/GI 2023-007
- Effective
Document Submittal Requirements for a New Single-Family Dwelling
IB/P/GI 2023-009
- Effective
Document Submittal Requirements for Tenant Improvement, Addition, or Alteration to An Existing Commercial/Industrial Building
IB/P/GI 2023-006
- Effective
Document Submittal Requirements for Zoning Plan Review for a New Multi-Family Dwelling
IB/P/GI 2023-031
- Effective
Filtered categories:
Los Angeles City Research Reports are allowed to be based on an Evaluation Report from a Nationally Recognized Model Code Agency. Who are Nationally Recognized Model Code Agencies currently accepted by LADBS Building Research Section?
May an ADU be created on a Lot that is a substandard Lot (for instance, due to an illegal Lot split in the past)?
May I get my restaurant permit before obtaining my Health Department approval?
My neighbor is excavation close to my property line. What can I do to protect my property?
Once a standard plan is selected, how does a customer indicate the use of the standard plan on the LADBS permit application?
The Department of Building and Safety sent me a Notice of Hearing regarding someone else's property. Why did I receive this?
The equipment has not been built yet. Can you approve the design of the equipment?