Electrical Permits
Electrical Permits are required for any electrical work.
About Electrical Permits
Electrical plans shall be filed with and approved by the Department (as an Electrical Plan Check) before any permit is issued for work related to the following:
- Theaters or motion picture theaters
- Places of assembly
- All health care facilities within the scope of Article 517 of the C.E.C.
- A new building or an addition to a building if the computed area exceeds 30,000 square feet (2,787 m2), any installation if the total load exceeds 400 amperes, or the installation of equipment rated 600 amperes or more. The computed area shall be the sum of the areas on each floor bounded by the outside surfaces of the exterior walls and shall include floor areas beneath building projections which extend more than 6 feet (1829 mm).
- All electrical installations over 600 volts.
- Installation in locations classified as hazardous locations, unless otherwise satisfactory to the Department.
- Projects which include the installation of exit signs, egress lighting or security lighting.
- Installation of a complicated electrical system as determined by the Department, such as, Emergency, Legally Required Standby, Fire Alarm, and Gas Detection Systems, except for the following:
- The addition of strobe power supplies and their attached devices connected to any existing fire control unit or panel.
- The installation of special extinguishing, central station monitoring systems, dialers, and their attached devices.
- The addition of any fire warning devices connected to an existing programmable fire warning system.
- Installation of lighting fixtures weighing more than 300 pounds.
- Installation of electrical devices, equipment and lighting systems subject to the California Energy Code
For more information on the Plan Check process, visit our Express Permit, Regular Plan Check and Counter Plan Check pages.
Note: San Pedro, South L.A. and West L.A. offices do not have Electrical Plan Check services at this time.
Additional Resources
- Code Amendment
- Forms & Applications
- Information Bulletins
- Requests for Modifications
- Standard Correction Lists
Filtered categories:
I am using listed components in my panel. Why do I need approval for the panel?
If a garage is converted into a Junior Accessory Dwelling Unit (JADU), do you need to provide replacement parking?
If a portion of a single family dwelling is converted into a JADU, do I need a separate address for the JADU?
If I make a mistake when entering my inspection type or contact information, can I correct it?
If the inspection I would like to request is not listed, what do I do?
I get an error message when I enter the permit number which is not a Fire Sprinkler, Elevator, or Pressure Vessel Permit. Why can't I request an inspection?
I get an error message when I try to request my fire sprinkler, elevator, or pressure vessel inspections. Can I use the internet to request these types of inspection?
I have a Los Angeles City Research Report (LARR) based on a Nationally Recognized Model Code Agency Evaluation Report. Is my Los Angeles City Research Report Approved for the Current Los Angeles City Building Code (LABC)?
I have a Los Angeles City Research Report (LARR) based on a Nationally Recognized Model Code Agency Evaluation Report. Is my Los Angeles City Research Report Approved for the Current Los Angeles City Building Code (LABC)?
Filtered categories:
DE ELEVADOR DEL SILLA DE RUEDAS
In/EPV/Form.008 Wheelchair Lift Mechanics
Definition of "Commenced Construction" and Similar Phrases
IB/P/G1 2023-016
- Effective
Definition of "Commenced Construction" and Similar Phrases
IB/P/GI 2020-016
Demand Factor of 0.65 to a Group of Reefer Receptacles
PC/ELEC/Mod8-2017
Demand Factor of 0.65 to a Group of Reefer Receptacles
PC/ELEC/Mod08-2017
Demolition Counter Plan Correction Sheet (2020 LABC)
PC/STR/Corr.Lst.110-2020
Demolition Counter Plan Correction Sheet (for 2011 Codes)
PC/STR/Corr.Lst.110-2013
Demolition of Structures Destroyed or Damaged By the 2025 Wildfires
IB/P/BC 2025-034
Filtered categories:
I am using listed components in my panel. Why do I need approval for the panel?
If a garage is converted into a Junior Accessory Dwelling Unit (JADU), do you need to provide replacement parking?
If a portion of a single family dwelling is converted into a JADU, do I need a separate address for the JADU?
If I make a mistake when entering my inspection type or contact information, can I correct it?
If the inspection I would like to request is not listed, what do I do?
I get an error message when I enter the permit number which is not a Fire Sprinkler, Elevator, or Pressure Vessel Permit. Why can't I request an inspection?
I get an error message when I try to request my fire sprinkler, elevator, or pressure vessel inspections. Can I use the internet to request these types of inspection?
I have a Los Angeles City Research Report (LARR) based on a Nationally Recognized Model Code Agency Evaluation Report. Is my Los Angeles City Research Report Approved for the Current Los Angeles City Building Code (LABC)?
I have a Los Angeles City Research Report (LARR) based on a Nationally Recognized Model Code Agency Evaluation Report. Is my Los Angeles City Research Report Approved for the Current Los Angeles City Building Code (LABC)?