Disabled Access and Accessibility
Plans submitted for new construction or alteration to an apartment and/or commercial building for a building permit will also be separately reviewed for disabled access and accessibility.
Additional Resources
- Documents & Applications
- Information Bulletins
- Requests for Modifications
- Standard Correction Lists
- Standard Plans
Filtered categories:
Procedures for the Application of ASCE 41-13 to Existing Buildings
IB/P/BC 2017-148
- Effective
Procedures for the Application of ASCE 41-17 to Existing Buildings
IB/P/BC 2020-148
- Effective
Procedure for Processing "Error or Abuse of Discretion" Appeals of LADBS Actions to the Board of Building and Safety Commissioners
IB/P/BC 2020-149
- Effective
Structural Design Guidelines for Non-Ductile Concrete Buildings
IB/P/BC 2020-152
- Effective
Data Collection, Material Testing and Condition Assessment Requirements for Existing Concrete Buildings
IB/P/BC 2023-153
- Effective
Filtered categories:
Which are the requirement in a soils, geology or combined soils and geology report?
Which code chapter does the leasing office need to comply with (11A or 11B)?
Filtered categories:
LAFD Requirement 96 Fire Department Reference - Requirements For Rooftop Photovoltaic (PV) Systems on One and Two Family Dwellings
Filtered categories:
Which are the requirement in a soils, geology or combined soils and geology report?
Which code chapter does the leasing office need to comply with (11A or 11B)?