Disabled Access and Accessibility
Plans submitted for new construction or alteration to an apartment and/or commercial building for a building permit will also be separately reviewed for disabled access and accessibility.
Additional Resources
- Documents & Applications
- Information Bulletins
- Requests for Modifications
- Standard Correction Lists
- Standard Plans
Filtered categories:
Office of Statewide Health and Planning Department Requirements (OSHPD 3) Supplemental Plan Check Correction Sheet (2017 LABC)
PC/STR/Corr.Lst.113-2017
Supplemental Plan Check Corrections Sheet for Fire District 1 and Very High Fire Hazard Severity Zone (2017 LABC)
PC/STR/Corr.Lst.109-2017
Supplemental Structural Correction Sheet Steel Brace Frame Design (2017 LABC)
PC/STR/Corr.Lst.044-2017
Storage Racks Plan Check Correction Sheets (2020 LABC)
PC/STR/Corr.Lst.021-2020
Supplemental Plan Check List for Concrete Shear Wall (2020)
PC/STR/Corr.Lst.034-2020
Supplemental Plan Check Correction Sheet For Concrete Special Moment Resisting Frame (2020 LABC)
PC/STR/Corr.Lst.035-2020
Supplemental Structural Correction Sheet for Flexible Diaphragm with Rigid Wall (2017 LABC)
PC/STR/Corr.Lst.038-2017
Supplemental Plan Check List for Prestress Concrete (2017 LABC)
PC/STR/Corr.Lst.043-2017
Supplemental Plan Check Corrections Sheet for Methane Seepage Regulations (2017 LABC)
PC/STR/Corr.Lst.055-2017
Supplemental Plan Check Corrections Sheet for Bicycle Parking Ordinance (Effective 3/13/2013)
PC/STR/Corr.Lst.111-2017
Filtered categories:
What can I do if my equipment is not listed by a City of LA recognized testing laboratory?
What can I do if some of the components in my equipment are not listed by a City of LA recognized testing laboratory?
What DA upgrades need to be made when a commercial building is altered?
What does the “Code Date” listed on the Los Angeles Research Report mean?
What does the “Code Date” listed on the Los Angeles Research Report mean?
Filtered categories:
Filtered categories:
What can I do if my equipment is not listed by a City of LA recognized testing laboratory?
What can I do if some of the components in my equipment are not listed by a City of LA recognized testing laboratory?
What DA upgrades need to be made when a commercial building is altered?
What does the “Code Date” listed on the Los Angeles Research Report mean?
What does the “Code Date” listed on the Los Angeles Research Report mean?