Disabled Access and Accessibility
Plans submitted for new construction or alteration to an apartment and/or commercial building for a building permit will also be separately reviewed for disabled access and accessibility.
Additional Resources
- Documents & Applications
- Information Bulletins
- Requests for Modifications
- Standard Correction Lists
- Standard Plans
Filtered categories:
Alternative Construction Materials (for 2011 Codes)
PC/STR/Mod104-2013
Fill Existing Pool in Lieu of Removing Pool Shell (for 2011 Codes)
PC/STR/Mod44-2013
Filtered categories:
How long do I have to wait for a Grading Pre-Inspection to be completed?
How long do I have to wait for a Sign Pre-Inspection (SPI) to be completed?
Filtered categories:
Concrete Proportioning and Admixture Qualification
IB/P/BC 2023-031
- Effective
Considerations for Benchmarking Buildings in the City of LA-091923-FINAL
Filtered categories:
How long do I have to wait for a Grading Pre-Inspection to be completed?
How long do I have to wait for a Sign Pre-Inspection (SPI) to be completed?