Disabled Access and Accessibility
Plans submitted for new construction or alteration to an apartment and/or commercial building for a building permit will also be separately reviewed for disabled access and accessibility.
Additional Resources
- Documents & Applications
 - Information Bulletins
 - Requests for Modifications
 - Standard Correction Lists
 - Standard Plans
 
Filtered categories:
    Do I need plan check for a potable water system when the water service is less than 2 inches?
  
  
    Do I need plan check if I am adding plumbing fixtures in an existing building that has a main pipe 2 inches diameter or larger?
  
  
    Do I need plan check to install an air conditioning system in a single dwelling?
  
  Filtered categories:
Filtered categories:
    Do I need plan check for a potable water system when the water service is less than 2 inches?
  
  
    Do I need plan check if I am adding plumbing fixtures in an existing building that has a main pipe 2 inches diameter or larger?
  
  
    Do I need plan check to install an air conditioning system in a single dwelling?